
Manual_S5_Airplus_2015_04_20
Page 50 / 68
©
Wodtke GmbH - Tübingen. All Rights and Changes Reserved.Printed 04/2015
Part No. 950 976
16.12 Completion of Maintenance
Work, Test Run and Mainte-
nance Reset
After completing the maintenance work, restore all
connections and perform a test operation.
The maintenance reset (counter reset) may only
be carried out via the control board once all of the
maintenance steps above have been fully com-
pleted.
After each maintenance, record the value dis-
played for "BG" (total operating hours) and "PG"
(total pellet consumption) on a piece of paper or in
a log book so that you can provide an overview of
performed maintenance in case of customer ser-
vice, and keep this document.
Our tip:
Have you really completely and uniformly cleaned
the combustion chamber, heat exchanger, all
heating gas flues, flue gas fan and connector?
Maintenance was only successful if the flue
gases have "free passage" over the entire
route from the burner pot to the chimney.
This
is not for appearances;
a single bottleneck
over
this route prevents the escape of flue gases, caus-
ing possible malfunctions. As a result, it is ineffec-
tive to clean individual spots to high polish but to
leave other spots uncleaned, or improperly
cleaned. All cross sections should be uniformly
cleaned and cleared of contaminants.
Maintenance Reset
Once maintenance is complete, the counter for the
maintenance indicator (PW) must be reset.
To do so, press the
1x.
Then press
or
until the indicator PW ap-
pears.
Then press and hold
and
until the dis-
play jumps to PW
– 1.5.
The maintenance reset is then complete.