Installation and commissioning
6
1
Installation and commissioning
1.1
Customers on-site connection requirements
Necessary preparatory work for electricity, water and drainage connections at the customer‘s premises are to be arranged by the machine owner/operator.
The work must be carried out by authorised installation technicians in compliance with general, country-specific and local regulations.
The WMF Service engineers may only connect the coffee machine to existing prepared connection points.
WMF Service is neither authorised nor responsible for carrying out any work on-site prior to connection.
For details, see the planning information on the website
www.wmf-kaffeemaschinen.de
Содержание 5000S
Страница 1: ...WMF 5000S Service manual KMT Technical Support Revision 03 2015 Rev 01 ...
Страница 3: ...Change history 3 Change history Rev 01 1st edition for series launch ...
Страница 23: ...Maintenance 23 3 2 Installation of maintenance packages required for different brewing times ...
Страница 30: ...Special tools and aids 30 ...