Operation
5 Operation
Prerequisites:
➤
The machine must be correctly erected and fully assembled.
➤
Only put the machine into operation if you are equipped with the prescribed
personal protective equipment. Details on this can be found in Chap. 2.5.4
on page 15.
➤
The material to be applied must be available in sufficient quantities.
Furthermore you need two appropriate containers for collecting excess
material. These containers are not included in the scope of delivery.
When processing and storing spray material, observe the recommendations
in the safety datasheet of the respective material manufacturers.
WARNING
If material pumps run dry, this can lead to fire or an explosion due to the
resultant friction heat.
➤
During operation ensure that the tanks never run empty.
➤
If this should occur, bring the respective pump to an immediate standstill
and trace the material.
5.1 Putting the machine into operation
Before starting work, check:
5
Are all the safety features present and fully functional (see chapter 2.4 on
page 12)?
5
Is the machine properly grounded (see chapter 4.3.2 on page 28)?
5
Is there enough release agent in the proportioning pump (see chapter 6.4.1
on page 40)?
During commissioning, check that the unit or its individual components are
leak-proof by slowly building up pressure and tighten the connections if neces-
sary.
Overview of the working steps during commissioning:
1.
Start the machine
2.
Put the flushing pump into operation
3.
Clean the machine (only during initial commissioning)
4.
Fill machine with processing material and vent
5.1.1 Start the machine
1.
Make sure that all air pressure regulators have been fully regulated back.
2.
Open the compressed air shut-off valve on the maintenance unit.
3.
Set the selector switch “Manual / Automatic” on the pressure and metering
monitoring to “Manual” and press the start button.