17
Procedures
Required material:
Kit boiler
UC-S: Item no. 30 000 119
UC-M; -L; -XL Item no. 30 000 120
Tool:
no special tool required
Important note:
The machine must be de-installed
The following manual applies for the UC-M; -L; -XL. In models of the
UC-S Series the boiler is located behind the rear panel and is well
accessible.
Observe the safety notes on page 7
Remove the right side panel
Remove the front panel
Pull the suction pipes out of the chemical containers
Remove the right stiffener wall
Completely drain boiler
Remove the hose at the back of the boiler
Pull off the thermo sensor that is located on the boiler
Unscrew the boiler
Remove the hoses at the top and front of the boiler
Unscrew the heating element
Do not disconnect the heating element
Pull out the old boiler and install the new one
Use a new o-ring seal
Again tighten the heating element
Again fix the hoses
Install the stiffener wall
Put the suction pipes into the chemical containers
Install the front panel
Carry out a function test
Ventilate the dosing devices
Carry out a safety test according to VDE 0701
Содержание UC-L
Страница 1: ...Winterhalter Undercounter Dishwashers UC Series Repair manual ...
Страница 10: ...8 Exchange collector ...
Страница 12: ...10 Exchange collector continuation ...
Страница 14: ...12 Exchange collector continuation ...
Страница 16: ...14 Exchange boiler heating element ...
Страница 18: ...16 Exchange boiler ...
Страница 22: ...20 Exchange tank heating element ...
Страница 24: ...22 Exchange pump head dosing device Fluidos ...
Страница 26: ...24 Exchange dosing device Fluidos ...
Страница 28: ...26 Exchange integrated water softener ...
Страница 30: ...28 Exchange integrated water softener continuation ...
Страница 32: ...30 Exchange heat exchanger radial fan ...
Страница 34: ...32 Exchange heat exchanger radial fan continuation ...
Страница 46: ...44 ...
Страница 47: ......