15
Procedures
Required material:
Kit heating element 4.9KW with fuse
Item no.
Kit heating element 6.5KW with fuse
item no. 30 000 124 (Japan, Australia)
Tool:
no special tool required
Note for UC-S
The following manual applies for the
UC-M; -L; -XL. In models of the UC-S
Series the boiler is located behind the rear
panel and can be accessed easily
Observe the safety notes on page 7
UC-M, UC-L, UC-XL
Remove the front panel
Pull the suction pipes out of the chemical containers
Remove the right stiffener wall
Completely drain boiler
Disconnect the main power cable of the boiler heating element
Unscrew 3 hexagonal nuts
Pull out the boiler heating element
If necessary, clean boiler on the inside
Replace the existing o-ring seal by a new one
Install the new boiler heating element
Connect the main power cable
Wires 1-3 connected to the gate at 2, 4, 6
Wires 4-6 connected to the clips X1-4, -5, -6
green-yellow wire connected to a grounding clip
Install the stiffener wall
Put the suction pipes into the chemical containers
Install the front panel
Carry out a function test
Ventilate the dosing devices
Carry out a safety test according to VDE 0701
Содержание UC-L
Страница 1: ...Winterhalter Undercounter Dishwashers UC Series Repair manual ...
Страница 10: ...8 Exchange collector ...
Страница 12: ...10 Exchange collector continuation ...
Страница 14: ...12 Exchange collector continuation ...
Страница 16: ...14 Exchange boiler heating element ...
Страница 18: ...16 Exchange boiler ...
Страница 22: ...20 Exchange tank heating element ...
Страница 24: ...22 Exchange pump head dosing device Fluidos ...
Страница 26: ...24 Exchange dosing device Fluidos ...
Страница 28: ...26 Exchange integrated water softener ...
Страница 30: ...28 Exchange integrated water softener continuation ...
Страница 32: ...30 Exchange heat exchanger radial fan ...
Страница 34: ...32 Exchange heat exchanger radial fan continuation ...
Страница 46: ...44 ...
Страница 47: ......