manualshive.com logo in svg
background image

3

Operating instructiOns piLZ

®

 heating mantLes, issue 2008-06

generaL Operating instructiOns

piLZ

®

 heating mantles for laboratory and industrial applications will function to 

your satisfaction provided you observe the following information. Our products 
are manufactured to a high quality standard; they are systematically monitored 

and checked during all stages of production and only leave our works after a final 

safety test. as a rule, piLZ

®

 heating mantles must be employed in accordance with 

the valid regulations. 

piLZ

®

 heating mantles are glass-silk insulated heating systems designed for use in 

industry and laboratories. the heating mantles are not protected against moisture 

because of their high temperature range. The flexible heating units can be adapted 

to the shapes and sizes of the corresponding vessels and thus ensure uniform heat 
transfer as well as careful treatment of the laboratory vessels. 

all piLZ

® 

 heating mantles are tested and fully heated up before leaving our works. any resulting discoloration of the glass fabric is technically 

induced and does not represent a deterioration in quality. 

intended use of piLZ

®

 heating mantles

piLZ

®

 heating mantles are designed for heating non-combustible, liquid or solid substances or mixtures in electrically non-conductive glass vessels (flasks).

note: in line with the relevant regulations, 
piLZ

® 

heating mantles are not suitable for heating electroconductive vessels. 

Only use glass vessels (flasks) that match the corresponding heating mantles in size and shape. PILZ

®

 heating mantles may only be operated by a qualified electrician 

or a person with electrotechnical training. The accepted rules and standards (VDE, SEV, ÖVE, DIN standards, and particularly the accident prevention regulations) must 

be complied with.

stable positioning of the piLZ

®

 heating mantle

the operator of a piLZ

®

 heating mantle must take appropriate measures to ensure that the heating mantle is safely positioned (e.g. fitting into a support, tripod). PILZ

®

 

heating mantles that have been built into corresponding housings by the manufacturer do not require any other positioning system. in the case of piLZ

®

 heating mantles 

of type series WHLG.. / WHLMG.. / WHLSG.. / WHU.. (metal housings) the screwed-on rod clamp may only be loaded in such a way that there is no risk of tilting or 
mechanical damage (e.g. use an additional stand with a broad base to guard against tilting).

caution: piLZ

® 

 heating mantles must always be in an upright, level position during operation. 

any objects on top of the glass vessel endanger the stability and need to be specially secured. 

piLZ

®

 heating mantles are suitable for carrying the deadweight of the glass vessels. With further setups, the additional weight must be taken up by suitable supports. 

Heating mantles of series WHG… are provided with special hooks for mounting on a tripod with support ring.
Heating mantles of series WHLG… ,WHLMG... , WHLSG… , WHU… are built into self-standing metal housings.

transport

piLZ

®

 heating mantles have to be suitably packed and transported with care. the connecting lead should never be pulled or used for carrying the heating mantle. sharp 

objects that could cause damage should be kept away from the device. To avoid damage (fire risk) the PILZ

®

 heating mantle must have cooled down sufficiently before 

being packed for transport.

Operation of piLZ

®

 heating mantles

piLZ

®

 heating mantles may only be operated in suitable and well-ventilated rooms. During operation all combustible and easily flammable objects must be no closer 

than 1 m from the piLZ

®

 heating mantle. 

grounding-type plug (schuko) as a circuit breaker (residual-current device)

in the case of piLZ

®

 heating mantles with a built-in power plug, a residual-current device in the lead serves as a suitable circuit breaker. 

Содержание PILZ WHG1 Series

Страница 1: ...Operating Instructions Betriebsanleitung Laboratory heating mantles Laborheizzhauben WHG1 G2 WHG2R G4R WHG2H WHLG2 WHLG ER WHLMG3 ER WHLSG2 ER WHU2 ER WHRE...

Страница 2: ...Betriebsanleitung Laborheizhauben WHG1 G2 WHG2R G4R WHG2H WHLG2 WHLG ER WHLMG3 ER WHLSG2 ER WHU2 ER WHRE...

Страница 3: ...zeichnet werden und an einem sicheren Ort zur Aufbewahrung abgestellt werden Die Freigabe zur Weiterverwendung kann nur durch eine zust ndige Elektrofachkraft oder eine elektrotechnisch unterwiesene P...

Страница 4: ...en Der Betreiber der PILZ Heizhaube hat durch entsprechende Ma nahmen daf r zu sorgen dass die PILZ Heizhaube einen sicheren Stand hat z B Einbau in einen Tragring Dreifu PILZ Heizhauben die vom Herst...

Страница 5: ...Die PILZ Heizhaube darf dann nicht mehr in Betrieb genommen werden und muss an einem geeigneten Ort ohne weiteren Gebrauch verwahrt werden Sie darf erst nach einer sicherheitstechnischen Pr fung durc...

Страница 6: ...LMG3 ER 3 Heizzonen 3 Stufen Zone 1 Zone 2 Zone 3 Leistungssteller 0 100 electronic WHLSG2 ER 2 Heizzonen 2 Leistungsstufen Min Max Schalter 50 100 Leistungssteller 0 100 electronic WHU ER 2 Heizzonen...

Страница 7: ...zeugen Sie sich vom ordnungsgem en Sitz des Glasgef es in der PILZ Heizhaube Nach Einstecken des Netzsteckers Fehlerstromschutzschalter kann die Heizhaube eingeschaltet werden Aus der Tabelle Schaltm...

Страница 8: ...plung an die Pilz Heizhaube angeschlossen Bild 4 Wird der FI Schutzschalter durch den Betrieb der Heizhaube an gesch tzten Stromkreisen z B im Labor nicht ben tigt so kann die Pilz Heizhaube auch ber...

Страница 9: ...EWG 92 31 EWG und 93 68 EWG bereinstimmen Folgende nationale Normen werden bei den bezeichneten Produkten eingehalten DIN EN 60519 1 2 Sicherheit in Elektrow rmeanlagen VDE 0721 1 2 Teil 1 Allgemeine...

Страница 10: ...Operating Instructions Laboratory heating mantles WHG1 G2 WHG2R G4R WHG2H WHLG2 WHLG ER WHLMG3 ER WHLSG2 ER WHU2 ER WHRE...

Страница 11: ...terwards not be put back into operation The defective PILZ heating mantle must be marked accordingly and stored in a safe place It can only be released for reuse by the electrician in charge or a pers...

Страница 12: ...table positioning of the PILZ heating mantle The operator of a PILZ heating mantle must take appropriate measures to ensure that the heating mantle is safely positioned e g fitting into a support trip...

Страница 13: ...ed from the mains by pulling out the power plug The heating mantle must not be put back into operation and should be stored in a suitable place without allowing reuse The PILZ heating mantle may only...

Страница 14: ...100 power selector 0 100 electronic WHLMG3 ER 3 heating zones 3 steps zone 1 zone 2 zone 3 power selector 0 100 electronic WHLSG2 ER 2 heating zones 2 power steps min max switch 50 100 power selector...

Страница 15: ...e and check that the glass vessel is correctly seated in the heating mantle Put the mains plug with residual current device into the socket and switch on the heating mantle The table under Switching o...

Страница 16: ...ling as a standard Fig 4 If the RCD is not required because the heating mantle is operated on a protected circuit e g in a laboratory the PILZ heating mantle may also be connected directly to the supp...

Страница 17: ...93 68 EEC The following national standards are adhered to with respect to the products described DIN EN 60519 1 2 Safety in electroheat installations VDE 0721 1 2 Part 1 General requirements Part 2 Pa...

Отзывы: