9. Slide the LNB into the feed arm, and re-install the two screws
(removed earlier) through the underside of the feed arm and LNB.
Tighten.
10. Slide the LNB guard up the feed arm and over the LNB. The front of
the LNB guard should be ~½
″
in front of the LNB and should not be
touching the LNB.
11. Install the four bolts through the four holes in the LNB guard. Thread a
nut onto each bolt, and tighten.
12. Connect the other ends of the sheathed cables to coax port C on the
top of the turret. Tighten the cable until fingertight, and then use a
7
/
16
”
wrench to tighten a quarter turn more.
13. Place the p-clamp on the sheathed
cable, and make sure the hole in
the p-clamp is positioned above
the cable. The p-clamp must be
14
inches
from the ends of the
sheathed cable. This point on the
cable may already be marked by
a zip tie, mark, or tape.
14. Align the hole in the p-clamp
with the hole in the lift arm.
Install the screw through the
p-clamp and lift arm, and tighten.
Stowing the Antenna
1. Plug in the interface box.
2. Press and hold “POWER” for two seconds to turn on the interface box.
Then, press the Power button again to stow the antenna.
7
P-clamp installed 14”
from ends of sheathed
cable, next to zip tie on
sheathed cable
Disclaimer:
Although every effort has been made to ensure that the information in this manual is correct
and complete, no company shall be held liable for any errors or omissions in this manual. Information
provided in this manual was accurate at time of printing.
Winegard and TRAV’LER are registered trademarks of Winegard Company.
DIRECTV is a registered trademark of DIRECTV, LLC. DISH is a registered trademark of DISH Network L.L.C.
Shaw Direct is a trademark of Shaw Satellite G.P.
Winegard Company • 3000 Kirkwood St. • Burlington, IA 52601-2000
1-800/788-4417 • FAX 319/754-0787 • www.winegard.com
Printed in U.S.A. • ©2013 Winegard Company Rev2 10-19 2452298