7)   Automatic detectors 

a)  Spray test aerosol on the detectors. 
b)  The actuators move open through to the end position. The red LED in the detector, the red alarm 

LED (also in the control panel) and the permanent acoustic signal in the operating panel are ON. 

c)  While running, press the Closed button at the ventilation button, then press both buttons, the 

actuators must neither close nor stop! 

d)  Press the reset/Closed button in the operating panel. The actuators close through to the end position. 

The ventilation function is released again. The red alarm LED (also in the control panel) and the 
signal generator are OFF. 

 

8)   Emergency power supply test 

a)  Remove the mains fuse from the control panel. Adhere to the VDE regulations! (only Germany 
     - see National guidelines) 
b)  The green mains and operating LED's are OFF, the yellow accumulator Led is flashing (control pabel 

in the accumulator mode). 
The malfunction message at the SHE main operating panels panels is ON. 

c)  The ventilation buttons are deactivated. 
d)  If the actuators were open, they will automatically close after 2 minutes. 
e)  Test the SHE trip and reset/closed as described under 5). 
f)  Refit the mains fuse. 
g)  The green mains and operating LED's are ON, the yellow accumulator LED is OFF. The malfunction 

message at the operating panels is OFF. 

 

9)   Activation of inspection check reminder 

a)  Connect power and back-up batteries to the smoke panel. 
b)  Connect all components to prevent fault signal. 
c)  Set SW1/1 to ON.. 
d)  The operation LED flashes app. 10 seconds to control the activation. 
e)  The maintenance reminder is now activated. 

 

10)    Wind/rain detector 

a)  Open the actuators with the ventilation button. 
b)  Wet the rain sensor, the actuators will fully close, the green wind/rain LED in the control panel is ON. 
c)  While running, press the Open button at the ventilation button, then press both buttons, the actuators 

must neither open nor stop! 

d)  The SHE trip has priority. 

 
When the start-up was successful, then close the doors of the operating panels and of the control panel. 
If the start-up was unsuccessful (error with one of the test run processes), please refer to the chapter Function 
description (see connection possibilities). If necessary, check the wiring in accordance with the wiring diagram. 
 

11)    Back-up batteries 

 

 

Содержание WSC 204

Страница 1: ...04BZ 0102 WSC 204KP 0102 install 1606 UK WindowMaster 2011 2016 WindowMaster is a registered trademark used under licence by WindowMaster Group WSC 204 WSC 204 0102 WSC 204MH 0102 WSC 204KP 0102 WSC 2...

Страница 2: ...10 4 6 Back up batteries charge 10 4 7 Operation Setting possibilities 10 5 Installation 11 5 1 Surface mounting 11 5 2 Countersunk mounting 12 5 3 Cable routing 12 5 4 Installation 12 5 5 Installatio...

Страница 3: ...ause death severe injury or considerable damage to assets The connection of the control system is reserved for qualified personnel Disconnect all poles of the unit from the supply voltage prior to ope...

Страница 4: ...batteries are fully charged 1 9Ah Current load of the actuators battery and 230V operation max 4 8A Current load of the smoke unit batteries surveillance periphery max 0 7A Switch on duration 40 ED Re...

Страница 5: ...ights to make changes 2 1 Accessories Alarm and fault module master slave WSA 301 Linking of wind rain signal module WSA 302 Timer ventilation module WSA 303 Gap ventilation module WSA 304B ASV Module...

Страница 6: ...6 3 Operating elements and fuse review...

Страница 7: ...ators The first 30 min after a SHE trig on WSC 204BZ only when triggered the break glass unit the actuators will be cyclically activated every 2 min in OPEN direction to loosen frost fastened windows...

Страница 8: ...on is only displayed in the corresponding smoke control panel and in the break glass unit connected to the master smoke control panel primary break glass unit type WSK 320 Option ASV connection module...

Страница 9: ...entilation function is out of operation and the green wind rain LED lights Activated alarm has 1 priority Option Transmission of the wind rain signal module WSA 302 The activated signal of the wind ra...

Страница 10: ...ossible Preset To show the activation the LED will flash 10 sec If SW1 1 is once again set on OFF during these 10 sec the prioritised activation is cancelled After a period of 12 month the inspection...

Страница 11: ...f Flashes when interrupted Lits when short circuit Check wiring and jumper J1 in the last or only break glass unit Rauchmelder smoke detector yellow Off Flashes when interrupted Lits when short circui...

Страница 12: ...E30 See also Cable Length page 12 However this has to be agreed with the Engineer or if necessary with the local fire protection department Do not reduce the cable cross sections specified in the cabl...

Страница 13: ...bles cross sections please refer to the following table Maximum actuator current 4 8A Note Be aware of the overall capacity of the smoke control panel Actuating current Sum of all motor currents per g...

Страница 14: ...14 7 Cable plan Smoke control panel WSC 204 204MH 204BZ 204KP With back up batteries Mains 230VAC 50 60Hz 150W...

Страница 15: ...15 8 Wiring diagram 8 1 Standard wiring diagram...

Страница 16: ...16 8 2 Wiring diagram WSC 204KP...

Страница 17: ...17 8 3 Various wiring diagrams...

Страница 18: ...accumulator LED is OFF The malfunction message at the operating panels is OFF 4 Ventilation keypad Closely observe the actuators during opening and closing They must not be impaired in any position by...

Страница 19: ...they will automatically close after 2 minutes e Test the SHE trip and reset closed as described under 5 f Refit the mains fuse g The green mains and operating LED s are ON the yellow accumulator LED i...

Страница 20: ...in the smoke panel and the break glass unit Remove all soiling from the units of the smoke and heat extraction system Check fastening and clamping screws for firm seating Carry out a test run of the...

Отзывы: