
27
2.
For the Installer
2.4.13 Ash box
(only BioWIN 2 Exklusiv)
or cover underneath reserve supply
container
(only BioWIN 2 Klassik/Premium)
If you have not already done so, move the boiler into its definitive installation position (observe minimum clearan-
ces, see section 2.4.4) and, using the four set screws, align horizontally or inclined slightly upwards towards the
rear – see also section 2.4.3.
BioWIN Exklusiv only:
– Fit the base for the ash box underneath the reserve supply container and bend the front part down to the gro –
Fig. 71.
– Push the ash box in at a slight left-angle and push in the ash box handle, leaving the openings on the side of
the ash box open – Fig. 72.
– Close the bracket fastener – Fig. 73.
– Adjust the ash-box set screw (BioWIN 2 Exklusiv only) on the boiler – Fig. 74.
Note!
The floor underneath the ash box has to be level. If necessary compensate, e.g. by screwing sheet
to floor.
Fig. 71 Fit the ash box base
Fig. 72 Push ash box in at a slight angle and
push in the ash box handle
Fig. 73 Close the bracket fastener
Fig. 74 Adjust set screw