background image

 
  
.

 
 
 
 

 

NOTE:

  Unit 

must 

be vented  

         to outside of the building. 

 
Decide on 

vertical

 or 

horizontal

 air discharge. For 

vertical air discharge

 remove the top air discharge 

knockout plates. To remove, break the metal web holding 
plate by placing a screwdriver at one corner of plate and 
hitting screwdriver sharply with hammer. After breaking a 
second web the plate can be flexed to break remaining 
webs. For 

horizontal air discharge

 remove the air 

discharge knockout plates from the rear wall of the hood. 

 
Always wear eye protection. 

 

For a vertical air discharge

, with the hood mounted 

under a cabinet (without duct cover), prepare cabinet for 
mounting the hood per 

FIG 

 2

. Use furring strips to level 

cabinet mounting surfaces with any cabinet trims. 
 

For a vertical air discharge

 and use of the duct cover 

locate the prescribed ducting per 

FIG-3.

 Hood, ducting 

and wiring should be completed before mounting duct 
cover. See instructions included with duct cover for duct 
cover mounting. 
 

For a horizontal air discharge

 refer to 

FIG- 4

. NOTE: 

Wiring access is located on the top hood surface. See  

FIG-2

 for wiring access location. 

 
 

Attach and secure the transition to the hood with #6 x 3/8” 

sheet metal screws and tape all joints prior to installing the 
hood. Attach hood to cabinet or wall using #10 wood 
screws. Holes are located in the back panel and top panel 
of the hood for mounting. Use minimum of four (4) #10 x 

¾” wood screws to mount the hood. Longer screws are 

required if wallboard or other nonstructural surfaces are 
used between the hood and main mounting surface which 

should be minimum of ¾” thick. When using rear holes for 

mounting use proper anchors (#10) if not engaging the 
wood structure. Prepare

 

cabinet for mounting the hood per 

FIG 

 2

. Use furring strips to level cabinet mounting 

surface with any cabinet trims.  
 
 

HINT:

 If you find vibration noise is present because of 

Cabinet structure use additional screws, in holes available, 
to rigidize mounting. 
 
Connect 120 volts 

 15 amp, 60 Hz power supply through 

the conduit hole in the top of hood, connecting to pigtail in 
hood junction box white to white, black to black and 
connect green ground wire to power supply ground wire per 
local codes. The VEN100E/150E ventilator will require 
revision of some wiring in the hood receptacle box and 
possible modification of air discharge opening 

 See 

VEN100E/150E instructions. 
   

NOTE: VEN150E requires a 20 AMP Power Supply 

 

The recommended height from counter top or cooking 
surface to the bottom edge of the hood is 30 to 36 inches.

 

Hood is recommended for use over domestic gas or electric 
appliances. Not recommended for use over solid fuel fire 
appliances 
 
 
 

Vertical Air Discharge:

 After installing the hood, install 

the internal blower (

see FIG 

 1

) unit by positioning the 

blower into bracket 

 A, notched blower bracket will center 

blower. Rotate into position against hood top and secure 
with #8 sheet metal screws via bracket 

 B. To ease 

assembly you should Predrive and then remove the #8 screw 
before installing the blower. 

Horizontal Air Discharge:

 

Position blower into bracket 

 C, rotate brackets 

 B against 

top of hood and fasten per previous instructions. If the 
remote ventilator is used see related instructions. 
 
 

CAUTION:

 The hood is of sufficient weight that two 

Installers are recommended to prevent injury or damage to 
the hood in handling. 
 
 
Turn the power on at the service entrance and check the 
operation of the controls. 
 

NOTE:

 Be sure that all dampers (Not Supplied) are 

operating properly and are free to open.

BACKDRAFT DAMPER

: It is recommended that a backdraft damper be used 

in all installations. In cold weather installations it is necessary to use a backdraft 
damper to minimize backflow of cold air into room. A non-metallic thermal 
break should also be used to minimize conduction of outside temperatures 
through the ductwork. The thermal break should be located as close as possible 
to where the ducting enters the heated portion of the house. 

SAFTY WARNING: 

Turn off power circuit at 
the service entrance and 
lockout panel before 
wiring the range hood. 

Содержание WPN

Страница 1: ...d Lock Service Disconnecting Means to Prevent Power From Being Switched On Accidentally When The Service Disconnecting Means Cannot be Locked Securely Fasten A Prominent Warning Device Such As A Tag To The Service Panel CAUTION TO REDUCE THE RISK OF FIRE AND TO PROPERLY EXHAUST AIR BE SURE TO DUCT AIR OUTSIDE FOR DUCTED FANS DO NOT VENT EXHAUST AIR INTO SPACE WITHIN WALLS OR CEILING OR INTO ATTICS...

Страница 2: ...rigidize mounting Connect 120 volts 15 amp 60 Hz power supply through the conduit hole in the top of hood connecting to pigtail in hood junction box white to white black to black and connect green ground wire to power supply ground wire per local codes The VEN100E 150E ventilator will require revision of some wiring in the hood receptacle box and possible modification of air discharge opening See ...

Страница 3: ...OF WALL CAP TRANSITION 10100 15 FIG 3 THE 8 DISCHARGE WITH THE TRANSITION 10100 WILL BE ON THE CENTER LINE OF HOOD WIDTH AND ON CENTER LINE OF 12 DIMENSION VERTICAL DISCHARGE FIG 4 14 4 1 8 1 7 5 2 1 4 10 2 1 10 C L HOOD A CUT HOLE IN DRYWALL TO ACCEPT TRANSITION 10100 HORIZONTAL DISCHARGE A CENTER OF ROUND DUCT USING 10100 TRANSITION SECURE TRANSITION TO HOOD USING TWO 6 X 3 8 SHEET METAL SCREWS ...

Страница 4: ...over which can be used as an alternate installation method to enclose the ventilation duct The hood can also be mounted under a cabinet HOOD UNDER CABINET INSTALLATION INSTALLATION HOOD WITH DUCT COVER Two typical installation options shown above When used the duct cover is designed to accommodate typical ceiling heights of 8 ft to 10 ft USING DUCT COVER SECTION 1 2 ONLY SECTION 2 ONLY USING DUCT ...

Страница 5: ...be used to this gap at the ceiling interface SPACING TO BE 1 8 LARGER THAN DUCT COVER BEING USED 2 When using the duct cover and hood locate hood centerline on wall and mount the Duct Cover Bracket to ceiling centered on the hood centerline use 8 x 1 1 2 screws to mount bracket Mount the bracket to the ceiling with edge A against the hood mounting wall Wood framing should be located behind wallboa...

Страница 6: ...ing of hood top to ceiling DESIRED DUCT COVER HEIGHT SCREW BOTH SIDES WITH 8 X 3 8 SCREWS 15 SECTION 19 SECTION 15 SECTION FLANGE 19 SECTION FLANGE 5 Predrive 8x1 2 screws into bottom flange of duct cover Remove screws and aside for use when mounting duct cover to hood 6 Install the duct cover onto the hood flanges facing down and spread the sides of the Duct Cover slightly and position the cover ...

Страница 7: ...4 5 6 18 W 5 1 2 2 1 1 2 3 4 4 3 2 1 RIGHT HEAT LIGHT HEAT LIGHT LEFT LIGHT LEFT RIGHT LIGHT 12 B 1 18 R 22 18 BL 23 18 B 24 18 B 14 18 B 15 18 W 21 18 B 16 18 B 18 18 B 19 18 B 17 18 W 20 18 W 10 18 W 18 B 18 BL 18 R 18 W 25 18 B 12 18 W 13 18 G 11 18 BL 3 18 B 2 18 R 4 BLOWER MOTOR 18 W 26 HEAT LIGHT SWITCH LEFT SWITCH HEAT LIGHT RIGHT BOX RECEPTACLE RECEPTACLE PLUG POWER SUPPLY N G L1 WIRING DI...

Отзывы: