3
OPM-114
REV B
SAVE THESE INSTRUCTIONS
This manual contains important instructions that should be followed
during installation and maintenance of the generator. Read and
understand all instructions in the manual before starting and operating
the generator.
USING THIS MANUAL
Congratulations on your choice of a WINCO generator. You have
selected a high-quality, precision-engineered generator designed and
tested to give you years of satisfactory service.
To get the best performance from your new generator, it is important
that you carefully read and follow the operating instructions in this
manual.
Should you experience a problem please follow the “Troubleshooting
Tables” near the end of this manual. The warranty listed in the manual
describes what you can expect from WINCO should you need service
assistance in the future.
COPY YOUR MODEL AND SERIAL NUMBER HERE
No other WINCO generator has the same serial number as yours.
If you should ever need to contact us on this unit, it will help us to
respond to your needs faster.
MODEL __________________________________________________
SERIAL NUMBER _________________________________________
PURCHASE DATE _________________________________________
DEALER NAME ___________________________________________
DEALER PHONE # ________________________________________
TESTING POLICY
Before any generator is shipped from the factory, it is fully checked
for performance. The generator is loaded to its full capacity, and the
voltage, current, and frequency are carefully checked.
Rated output of generator is based on engineering tests of typical units,
and is subject to, and limited by, the temperature, altitude, fuel, and
other conditions specified by the manufacturer of applicable engines.
This unit comes factory set for either key start or manual start. With the
DSE 7310 MKII controller used in the manual start option it is possible
to wire the control for remote start. Wiring instructions can be found
further in this manual. The key start version does not have this option.