background image

6

OPM-124/B

PREPARING THE UNIT

UNPACKING

CAUTION: EQUIPMENT DAMAGE

When you unpack your new generator, be sure to 

remove all of the information sheets and manual from 

the carton.

1. As you receive your unit, it is critical to check it for any 

damage. If any damage is noted, it is always easiest to 

refuse the shipment and let WINCO take care of the freight 

claim. If you sign for the unit, the transfer of the ownership 

requires that you file the freight claim

2. Before proceeding with the preparations of your new 

generator for operation, take a couple of minutes to ensure 

the unit you have received is the correct model and review 

the specification pages in this manual to ensure that this 

unit meets your job requirements.

CAUTION

These units are shipped with oil. Be sure to check oil 

levels before operating. See engine manufacturer’s 

instruction manual for recommended oil requirements 

before initial starting.

Содержание PSS150-17

Страница 1: ...contact us on this unit it will help us to respond to your needs faster MODEL __________________________________________________ SERIAL NUMBER _________________________________________ PURCHASE DATE...

Страница 2: ...contains important instructions that should be followed during installation and maintenance of the generator Read and understand all instructions in the manual before starting and operating the gener...

Страница 3: ...mixed with fresh air A Operate only in well ventilated areas B Never operate indoors including attached garages C Never operate the unit in such a way as to allow exhaust gases to seep back into close...

Страница 4: ...em 12 Volt Muffler Standard Fuel Consumption full load LP NG 19 83 GAL HR 1 832 410 BTU HR 2 014 FT HR 2 014 300 BTU HR CAUTION EQUIPMENT DAMAGE The adjustable breaker has an Instant Trip that must be...

Страница 5: ...a 3 second start delay and a 15 second transfer delay to allow the engine to warm up before transferring the load to the generator When the line power is restored the ATS has a 5 minute transfer dela...

Страница 6: ...laim If you sign for the unit the transfer of the ownership requires that you file the freight claim 2 Before proceeding with the preparations of your new generator for operation take a couple of minu...

Страница 7: ...ovided be interpreted to conflict with any local state or national codes If in doubt always consult your local fire marshal gas supplier or building inspector WARNING FIRE HAZARD All fuel runs should...

Страница 8: ...voir If this is not done the demand regulator on the unit and the pressure regulator in the fuel line will interfere with each other This regulator must be sized to accommodate the demand of the gener...

Страница 9: ...mall rocker switch has been provide on the underside of the engine control cabinet for this purpose Opening the rocker switch will tell the ECU mounted on the engine that you are operating on NG Fuel...

Страница 10: ...to the skin and eyes It is electrically conductive and corrosive The following precautions must always be taken 1 Always wear full eye protection and protective clothing 2 Where electrolyte contacts...

Страница 11: ...without over charging them During this stage the green LED is constantly lit There are optional 5 and 10 amp chargers available that may be installed on some units The block heater is thermostatically...

Страница 12: ...2 37 1 2 803 5 3 9 1 7 11 50 1 25 2 1 1 2 3 03 2 2 29 5 16 250 5 0 7 51 66 75 0 7 6 817 75 3 366 1 335 7 7 66 0 7 7 7 5 1 02 3 57 7 6 5 1 217 16 35235 7 5 1 250 7 21 21 1 72 1 2 81 87 25 86 6 352 7 0...

Страница 13: ...ntrance rated This will allow you to test the generator under load Should you ever have to work on the switch you will be able to disconnect the power and work on the switch cold without having the po...

Страница 14: ...art relay is closed again B ESTOP ESTOP Remote Emergency Stop terminals These two terminals are shipped with a jumper installed If your application requires the installation of a Remote Emergency Stop...

Страница 15: ...T UP WARNING EQUIPMENT DAMAGE Before attempting to start this unit complete your pre start checklist and ensure the generator mainline circuit breaker is in the proper position prior to starting Start...

Страница 16: ...ICE If for any reason during the check out procedure the voltage and frequency are not correct depress the STOP RESET button and correct the trouble before proceeding 4 Stopping There are two ways to...

Страница 17: ...to increase dampening effect 4 LINK POWER RESPONSE A B 550kW Fast B C 100 550kW Fast A C 100kW Fast B D 100kW Slow 5 UFRO Under Frequency Roll Off Clockwise decreases KNEE point 6 SWITCH Select alter...

Страница 18: ...ty air cleaner filter 7 Defective fuel solenoid valve 8 Low Voltage from battery to fuel solenoid must hold 12 Volts during cranking 9 Defective fuel regulator 10 Defective starter fuel solenoid relay...

Страница 19: ...r that all power has been disconnected AUTOMATIC TRANSFER SWITCH Clean and inspect the switch once a year De energize all power sources both line and engine generator set then brush and vacuum away an...

Страница 20: ...C WIRING HIGH AND LOW WYE THREE PHASE L 120 208 VOLTS THREE PHASE HIGH WYE 277 480 VOLTS 24 5060 00 60708 165 REE PHASE AC WIRING H AND LOW WYE THREE PHASE LOW WYE 120 208 VOLTS SE HIGH WYE TS 3 PH HI...

Страница 21: ...21 OPM 124 B THREE PHASE DELTA 120 240 VOLTS WIRING DELTA LE PHASE 40 VOLTS 4 LEAD 3 PH DELTA 120 240V 12 LEAD 1 PH 120 240V DOUBLE DELTA...

Страница 22: ...22 OPM 124 B ENGINE HARNESS SCHEMATIC...

Страница 23: ...1 1 77 77 1 5 7 50 1 2 6 211 725 211 725 66 86 86 86 86 86 36 1 2 8 1387 20021 6 5 1 1 6 5 1 1 1 1 1 36 32 5 6 7 66 0 5 1 6723 6 7 66 8 6 7 21 6 7 9 5 92 7 8670 17 5 267 7 9 5 1 855 17 66 7 50 1 2 803...

Страница 24: ...quires replacement of engine part or component of the product that is no longer manufactured or available Additionally WINCO Inc will not be liable for any engine replacement that may require an emiss...

Отзывы: