- 72 -
12,000 lb Square Jack
C E Q U E N T
TM
12,000 lb Square Jack
TRAILER PRODUCTS
Direct Mount:
1. All welding must be performed by
an AWS certified welder.
2. Place the jack at the desired
location. Weld 3” in 2 locations on both
sides of the jack using a 1/4” fillet weld.
Weld-on Pivot Tube Mounting
Instructions:
1. All welding must be performed by an AWS
certified welder.
2. The non-beveled side of the pivot tube is
welded to the tongue.
3. Place the weld-on pivot tube against the
tongue and weld all around with a 1/4”
fillet weld. Align one set of pivot mount
holes vertically.
4. Mate the jack to the pivot tube and secure
the supplied pin.
Drop Leg Operation
Spring Return Drop Leg Operation:
1. Verify that the jack is not supporting any
load.
2. If extended, place your foot on foot plate
to control the return of the drop leg.
3. Disengage drop leg pin by rotating to the
disengaged position.
4. Carefully move the drop leg to the desired
position using your foot.
5. Engage the drop leg pin by rotating it to
the engaged position and into the desired
adjustment hole.
Drop leg will
naturally retract
very quickly.
WARNING
Содержание GOOSENECK LIVESTOCK
Страница 40: ... 40 Electrical System Electric Hydraulic Brake Application System ...
Страница 43: ... 43 Electrical System Electric Brakes Wiring Diagram ...
Страница 44: ... 44 Electrical System Vacuum Hydraulic Brakes Wiring Diagram ...
Страница 75: ... 75 ...
Страница 78: ... 78 ...
Страница 79: ... 79 ...