English
STS 80
[kW]
P2
≤
3.8
STS 100
[kW]
3.9
≤
P2
≤
8.4
Mains fuse (time-lag)
16 A
36 A
Cable cross-section
7 x 1.5
10 x 1.5
Cable diameter
17 mm approx.
19 mm approx.
Recommended PG screw
PG 21/M
PG 29/M
●
Pump must be earthed in compliance with regulations.
●
For pumps that are installed for stationary use, the metal pump housing must also be
earthed in accordance with EN 50014. Attach the protective conductor connection (as com-
pliant with EN 60335) to the drill hole labelled with the earth symbol (
) and located on the
handle using a suitable screw, nut, tooth lock washer and standard washer.
●
Use a cable with diameter of min. 2.5 mm² to 6 mm², or follow the local regulations, to con-
nect the protective conductor connection.
●
We also advise you to use a residual current operating device.
●
The switch box for the pump(s) should be obtained as an accessory.
ATTENTION!
Where you provide your own switch box, you must ensure it meets with
the following energy supplier requirements:
●
P2
≤
3.8 kW: direct starting
●
P2
≥
3.9 kW: star delta starting
●
The provisions laid down by your local energy supplier will determine the threshold between
direct and star delta starting.
●
Motor safety switch (set to the nominal pump motor current indicated on the rating plate).
●
A standard measuring appliance can be used to switch the thermal winding contact (WSK)
for the thermal monitoring of the motor. Switch at 230 V AC, max. 2 A.
Recommended level: 24 V DC.
●
Connecting cables should be connected to the leads as follows:
7-lead connection cable:
STS 80 / 100
1.5
Lead no.
1
2
3 green/yellow
4 5 6
Terminal
U1 V1 W1
PE
WSK
WSK
unused
Switching type: direct start
10-lead connection cable:
STS 100
1.5
Lead no.
1 2 3 4 5 6
green/yellow
7 8 9
Terminal
U1 V1 W1 V2
W2
U2
PE
WSK
WSK unused
Switching type: star delta starting
Direct starting possible where switch box is wired as follows:
L1
→
U1 + W2
L2
→
V1 + U2
L3
→
W1 + V2
17
Содержание Wilo-Drain STS 100 Series
Страница 2: ...Fig 1...
Страница 3: ...Fig 2a Fig 2b...
Страница 5: ......
Страница 61: ...STS 80 65 STS 100 100 20 10 2 2 1 2 2 2 3 2 4 VDE 58...
Страница 63: ...4 2 10 4 3 1 2 5 STS80 STS100 5 1 Wilo 80 100 Tmin 2a 2 Tmin Construction with cooling jacket Wilo 60...
Страница 68: ...7 3 1000 M8 4 1 8 8 1 WSK 8 2 3 Wilo 65...
Страница 69: ......