30
WILO SE 03/2016 V06 DIN A4
English
PRODUCT DESCRIPTION
3.2.5. Versions
The lifting unit is available in the following ver-
sions:
• Single-phase version including switchgear and
shockproof plug
• Three-phase version including switchgear and
CEE plug
3.3. Operating principle
The sewage that arrives is channelled into the
collection reservoir via the inlet pipes, where it
collects.
If the water level rises as far as the switch-on lev-
el then the pump is switched on by the integrated
level control and the collected sewage is pumped
into the connected pressure pipe.
The pump is switched off when the switch-off
level is reached and the set follow-up time has
elapsed.
If the high water level has been reached, an
acoustic and optical warning is given, the forced
switch-on of the pump follows and the col-
lective fault signal is activated. As soon as the
water drops below the high water level, the pump
is switched off once the follow-up time has
elapsed, and the warning message is acknowl-
edged automatically.
3.4. Operating modes
3.4.1. Operating mode S3 (intermittent operation)
This operating mode involves the maximum ratio
between operating time and downtime:
S3 15%/120 s
operating time 18 s / downtime 102 s
3.5. Technical data
Approved field of application
Max. intake/h:
600 l
Max. admissible pressure in
the discharge pipeline:
1.5 bar
Max. delivery head [H]:
See rating plate
Maximum volume flow [Q]:
See rating plate
Max. permitted geodesic
delivery head:
5 m
Fluid temperature [t]:
+ 3...+ 40 °C
Max. fluid temperature:
+ 60 °C for max. 3 min
Ambient temperature:
+ 3...+ 40 °C
Max. solid grain size:
40 mm
Motor data
Mains connection [U/f]:
See rating plate
Power consumption [P
1
]:
See rating plate
Rated power [P
2
]:
See rating plate
Rated current [IN]:
See rating plate
Speed [n]:
See rating plate
Activation type [AT]:
direct
Protection class unit:
IP 68 (2 mWs, 7 days)
Switchgear protection class: IP 54
Insulation class [Cl.]:
H
Max. switching operations/h: 30
Cable length:
4 m + 1.5 m
Operating mode:
S3 15%/120 s
Connections
Pressure connection:
DN 80/PN 10
Inlet connection:
DN 100, 2x DN 40
Ventilation connection:
DN 70
Dimensions and weights
Gross volume:
45 l
Switching volume:
21 l
Switching level ON (for
installation level):
180 mm
Dimensions (WxHxD):
799 x 499 x 300 mm
Diagonal dimension:
853 mm
Sound‑pressure level*:
70 dB(A)
Weight:
30 kg
* The sound-pressure level depends on the
duty point and may vary. Incorrect installation
or impermissible operation can increase the
sound-pressure level.
3.6. Type key
Example: Wilo-DrainLift S 1/6M RV
DrainLift
Lifting unit
S
Size
1
Single-pump system
6
Maximum delivery head in m at Q = 0
M
Mains connection version:
M = 1~230 V, 50 Hz
T = 3~400 V, 50 Hz
RV
Version with non-return valve
3.7. Scope of delivery
• Sewage lifting unit ready for connection with
switchgear and plug
• 1x inlet seal DN 100 for plastic pipe (Ø 110 mm)
• 1x hole saw (Ø 124) for inlet DN 100
• 1x non‑return valve DN 80 (only for “RV” version)
• 1x Flange connector DN 80/100
• 1x PVC hose section (Ø 50 mm) with clamps for
inlet connection DN 40
• 1x collar for venting connection DN 70
• 1 set of fixation material (2 mounting brackets,
screws, wall plugs, washers)
• 3x sound absorption strips for insulation of struc-
ture-borne noise
• Installation and operating instructions
3.8. Accessories (optionally available)
• On pressure side:
• DN 80 flange connector for connection of a
DN 80 pressure pipe