Installation and operating instructions Wilo-Control SC-L 37

INSTALLATION English

4.  Fix the power supply cable to the wall.

Floor model

The floor model is supplied as standard with a 

100 mm high pedestal with a cable inlet. It is 

installed free-standing on a level surface with 

sufficient bearing capacity.

Other supports are available on request.

Outdoor installation

The standard mounting pedestal with cable inlet 

must be buried as far as the marking or recessed 

in a concrete base. The switchgear is then fixed to 

this pedestal.

1.  Position the pedestal at the desired mounting 

location.

2.  Insert the pedestal into the ground as far as the 

marking. We recommend fixing the pedestal using 

a concrete base as this guarantees the greatest 

possible stability. 

Ensure the pedestal is plumb-vertical.

3.  Secure the switchgear on the pedestal using the 

enclosed fixation material.

5.3.3.  Positioning of signal transmitters

For automatic control of the connected pumps, 

a corresponding level control device must be 

installed. This needs to be provided by the cus-

tomer.

Float switches or level sensors may be used as 

signal transmitters. The corresponding signal 

transmitters must be installed according to the 

unit's installation plan.

DANGER - explosive atmosphere! 

If the connected signal transmitters are used 

in potentially explosive areas, the Ex-version 

of the switchgear (SC-L...-Ex) must be used. 

Use of the standard switchgear can lead to 

fatal injury due to explosions! Connection 

must always be carried out by a qualified 

electrician.

Note the following:

• 

When using float switches, ensure that these can 

move unobstructed in the operating space (pump 

chamber, reservoir).

• The water level of the connected pumps must not 

fall below the minimum.

• The maximum switching frequency for the con-

nected pumps must not be exceeded.

5.3.4.  Dry-running protection

Dry-running protection can be provided via a 

separate float switch or via the level sensor.

When using the level sensor, the switching point 

must be set via the menu.

A forced switch-off of the pumps always 

occurs, irrespective of the selected signal 

transmitter.

5.3.5.  High water alarm

The high water alarm can be via a separate float 

switch or via the level sensor.

When using the level sensor, the switching point 

must be set via the menu.

Forced activation of pumps only occurs if the 

high water alarm is realised via a float switch 

however.

5.4.  Electrical connection

POTENTIALLY fatal danger due to electrical 

voltage! 

Incorrect electrical connections can cause fa-

tal electric shocks! Electrical connections may 

only be carried out by a qualified electrician 

approved by the local energy supply company, 

in accordance with locally applicable regula-

tions.

DANGER - explosive atmosphere! 

If the connected pumps and signal transmit-

ter are used in potentially explosive areas, 

the Ex-version of the switchgear (SC-L...-Ex) 

must be used. Use of the standard switchgear 

can lead to fatal injury due to explosions! 

Connection must always be carried out by a 

qualified electrician.

NOTE

•  Depending on the system's impedance and the 

connected consumers' max. no. of connections/

hour, voltage fluctuations or voltage drops may 

occur. Always have the electrical connections 

carried out by an electrician authorised by the 

local energy supply company.

•  When using shielded cables, the shielding must 

be attached to the earthing rod on one side of 

the switchgear!

•  Observe the installation and operating in-

structions for the connected pumps and signal 

transmitters.

• The mains connection current and voltage must 

be as stated on the rating plate.

• Fuse protection on the mains side must be in 

accordance with the data in the wiring diagram. 

All-pole disconnecting, K-type circuit breakers 

must be installed!

• A residual-current device (RCD, type A, sinusoidal 

current) must be installed in the supply line. Ob-

serve the local laws and regulations on this too!

• Route the power supply cable in accordance with 

the valid norms and regulations and according to 

the wiring diagram.

• Ground the system (switchgear and all electric 

consumers) in accordance with the regulations.

Содержание Control SC-L

Страница 1: ...otice de montage et de mise en service es Instrucciones de instalaci n y funcionamiento it Istruzioni di montaggio uso e manutenzione pt Manual de Instala o e funcionamento nl Inbouw en bedieningsvoor...

Страница 2: ...Fig 2B Fig 2A Fig 1 1 2 3 4 1 2 3 3 4 5 6 6 7 1 2 3 3 4 6 5 7...

Страница 3: ...Fig 4 Fig 3 Fig 5 dry run 4 all OFF 3 P1 ON 1 P2 ON 2 high water 5 5 P1 OFF 2 P1 ON 1 P2 ON 3 P2 OFF 4 6 7 8 low water 4 dry run Ext OFF 5 OFF 3 ON 1 2 high water...

Страница 4: ...erating modes and operation principle 40 6 2 Menu control and structure 41 6 3 Initial commissioning 41 6 4 Setting the operating parameters 41 6 5 Forced switching of the pumps in case of dry run or...

Страница 5: ...ual refers to the switchgear indicated on the title page 1 5 Warranty In general the specifications in the current Gen eral Terms and Conditions apply to the warranty You can find these here www wilo...

Страница 6: ...must be shut down immediately by the operator Tools and other objects should be kept in their designated places The switchgear may not be installed in potentially explosive areas There is a risk of e...

Страница 7: ...LED indicators The switchgear comprises the following main components Main switch for switching the switchgear on off Control panel LEDs for displaying the current operating state operation fault LC d...

Страница 8: ...sion for pumps and signal transmitters used in potentially explosive areas 3 7 Options Connection for 3 or 4 pumps Customer specific adjustments for special appli cations 3 8 Scope of delivery Switchg...

Страница 9: ...by a qualified electrician The installation location must be clean dry and free of vibrations Avoid exposing the switchgear to direct sunlight The customer must provide the power supply cables These m...

Страница 10: ...using the level sensor the switching point must be set via the menu A forced switch off of the pumps always occurs irrespective of the selected signal transmitter 5 3 5 High water alarm The high water...

Страница 11: ...otection be set 5 above the current measured at the duty point Star delta activation Set the motor protection to 0 58 x the rated current The maximum start up time in star connection is 3 seconds Pump...

Страница 12: ...2 5 m Display range 0 2 5 m Setting 1 V 0 25 m Insert the cable ends of the cable laid on site through the threaded cable connections and secure accordingly Connect the wires to the terminal strip acc...

Страница 13: ...ed Fig 4 Illustration of the switching points with a level sensor in the Empty operating mode using the example of two pumps 1 Base load pump ON 5 Dry running protection 2 Base load pump OFF 6 High wa...

Страница 14: ...All terminals must be retightened Motor protection correctly set The separate HAND 0 AUTO switch for each pump must be set to AUTO A The factory setting for these is 0 OFF Switching on 1 Turn main sw...

Страница 15: ...2 4 Peak load pump 1 off Value range 0 06 to 12 42 Factory setting 0 50 1 2 2 5 Peak load pump 2 on Value range 0 09 to 12 45 Factory setting 1 00 1 2 2 6 Peak load pump 2 off Value range 0 06 to 12...

Страница 16: ...2 2 x Running time of the individual pumps 4 2 3 0 Unit switching cycles 4 2 4 x Switching cycles of the individual pumps 4 3 0 0 Details of switchgear 4 3 1 0 Switchgear type 4 3 2 0 Serial number as...

Страница 17: ...6 1 0 General pump cycling Values ON OFF Factory setting ON 5 6 2 0 Pump cycling after time interval Values ON OFF Factory setting OFF 5 6 3 0 Running time of base load pump until pump cycling Value...

Страница 18: ...tion Run At least one pump is running Menu 5 5 2 0 SSM The required logic of the collective fault signal can be set Fall negative logic falling edge Rise positive logic rising edge Menu 5 6 0 0 Pump c...

Страница 19: ...ide potentially explosive areas 7 3 Activating the switchgear NOTE Following a power supply interruption the switchgear will automatically start up in the last operating mode set 1 Turn main switch to...

Страница 20: ...hand the cover must be opened There is a risk of fatal injury due to live parts This work may only be carried out by a qualified electrician In case of a control failing the individual pumps can be sw...

Страница 21: ...nsure reliable operation various maintenance tasks must be carried out regularly NOTE When used in sewage lifting units inside build ings or on land plots the maintenance intervals and work shown in D...

Страница 22: ...ected pump was tripped Remedy See installation and operating instructions for the connected pump request these from Wilo customer service E20 x Fault Temperature monitor for motor winding Cause Motor...

Страница 23: ...r in power supply phase error incorrect rotat ing field low voltage Error in motor winding WSK PTC impermeability External off Pump Pump 1 Pump 2 Pump 3 Pump 4 Pump cycling Time dependent pump cycling...

Страница 24: ...d pump 3 Activation threshold Peak load pump Delay time for activation Peak load pump 1 Deactivation threshold Peak load pump 2 Deactivation threshold Peak load pump 3 Deactivation threshold Peak load...

Страница 25: ...0 071 24 15 0 0 087 6 15 0 0 063 12 15 0 0 052 18 15 0 0 045 24 18 5 0 059 6 18 5 0 043 12 18 5 0 035 18 22 0 0 046 6 22 0 0 033 12 22 0 0 027 18 11 3 Spare parts Spare parts can be ordered from Wilo...

Страница 26: ......

Страница 27: ...ot kompatybilno ci elektromagnetycznej 2004 108 WE 2004 108 EG Sm rnice pro n zk nap t 2006 95 ES dyrektyw niskonapi ciow 2006 95 WE 2006 95 EG pou it harmoniza n normy zejm na stosowanymi normami zha...

Страница 28: ......

Страница 29: ...Pioneering for You WILO SE Nortkirchenstra e 100 44263 Dortmund Germany T 49 0 231 4102 0 F 49 0 231 4102 7363 wilo wilo com www wilo com...

Отзывы: