PAGE 2 OF 98
NIGHT SCAN VERTICAL
OPERATING INSTRUCTIONS
TP-4836201-G
MARCH 2021
Contents
1 Safety Summary................................................................................................... 5
1.1 Signal Word Definitions............................................................................................. 5
1.2 Safety Instructions .................................................................................................... 5
1.3 Symbols Used on Product Labels........................................................................... 10
2 Specification Compliance ................................................................................. 13
2.1 NFPA 1901-2016 .................................................................................................... 13
2.2 CE Declaration of Conformity ................................................................................. 13
3 Introduction........................................................................................................ 15
3.1 Additional Documentation ....................................................................................... 15
3.2 Intended Use........................................................................................................... 15
3.3 Mast Position Definition .......................................................................................... 16
3.4 Mast Component Descriptions................................................................................ 16
3.5 Remote Control Options ......................................................................................... 21
4 Technical Data.................................................................................................... 23
5 Installation.......................................................................................................... 25
5.1 Mounting Location Requirements ........................................................................... 25
5.1.1 Dimensions ................................................................................................... 26
5.2 Recommended Installation Tools............................................................................ 26
5.3 Unpacking & Handling ............................................................................................ 26
5.4 Attaching to the Vehicle .......................................................................................... 27
5.4.1 Attach Internal Mounting Kit.......................................................................... 28
5.4.2 Attach the Base Plate to the Mast................................................................. 30
5.4.3 Attach the Base Plate to the Vehicle............................................................. 30
5.4.4 Attach the Support Bracket .......................................................................... 31
5.4.5 Attach Optional Shelf Bracket ....................................................................... 32
5.4.6 Attach the RCP Saddle Brackets.................................................................. 34
5.5 Attaching the Control Box ....................................................................................... 36
5.6 Attaching the Air Connections................................................................................. 37
5.7 Attaching the RCP to the Mast................................................................................ 39
5.8 Installing the Magnetic Switches............................................................................. 40
5.9 Installing Remote Control........................................................................................ 41
5.9.1 Wired Hand-Held Remote Control (HHRC) .................................................. 41
5.9.2 Panel Mount Remote Control (PMRC).......................................................... 43
5.9.3 Wireless Remote Control.............................................................................. 44
5.10 Electrical Installation Detail ................................................................................... 44
5.10.1 Wiring Remote Control Cable to the Base Board ....................................... 45
5.10.2 Wiring Magnetic Switches to the Base Board ............................................. 45
5.10.3 Wiring DC Source Power to the Mast Control Circuit ................................. 45
5.10.4 Wiring Source Power to the Lighting Circuits.............................................. 46
5.10.5 Wiring Vehicle Safety Interconnect Circuit.................................................. 47
5.10.6 Wiring Optional Enable Circuit .................................................................... 48
5.10.7 Power-up and Magnetic Switch Adjustment ............................................... 48
5.10.8 Secure Wiring and Attach Control Box Lid.................................................. 48
5.11 Test the Installation............................................................................................... 49
6 Operation............................................................................................................ 51
6.1 Pre-Operation Check .............................................................................................. 51
6.2 Remote Control Functions ...................................................................................... 51
Содержание NIGHT SCAN VERTICAL
Страница 2: ......
Страница 6: ...PAGE 4 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Страница 14: ...PAGE 12 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Страница 16: ...PAGE 14 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Страница 26: ...PAGE 24 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Страница 52: ...PAGE 50 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Страница 58: ...PAGE 56 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Страница 73: ...PAGE 71 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Страница 74: ...PAGE 72 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Страница 75: ...PAGE 73 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Страница 76: ...PAGE 74 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Страница 77: ...PAGE 75 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Страница 78: ...PAGE 76 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Страница 80: ...PAGE 78 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Страница 81: ...PAGE 79 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Страница 82: ...PAGE 80 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Страница 94: ...PAGE 92 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Страница 98: ...PAGE 96 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...
Страница 100: ...PAGE 98 OF 98 NIGHT SCAN VERTICAL OPERATING INSTRUCTIONS TP 4836201 G MARCH 2021 ...