APPLIANCE COMMISSIONING CHECKLIST 

It is the installers responsibility to complete the following checklist when commissioning this 

appliance. The informaon recorded on this page may be requested at the me of any warranty 

call made. If the informaon is not made available it may affect the warranty support for the 

customers appliance.  

CHECK LISTS 

PASS 

FAIL 

Check flue is suitable for this appliance 

 

 

Check flue flow prior to installaon 

 

 

Check spillage aer installaon 

 

 

Check standing gas pressure 

 

mbar 

Check working pressure on full rate  (Min. 18.5) 
Ensure all other gas appliances are running on full rate 

 

mbar 

Complete relevant secon of warranty forms , complete with Gas 
Safe registraon details 

 

 

 

 

 

 

 

 

Instruct the customer on lighng, maintenance and servicing 
procedures. (Including glass removal and ceramic placement) 

 

 

If you can smell gas, immediately turn off the gas supply using the control valve at the meter in your home.  
Do not smoke and turn off all sources of ignion, i.e. boilers or gas hobs. Open windows and doors to venlate 
the room or building. 
 
Call the Gas Emergency Service 

 0800 111 999 (England Scotland and Wales) 

 

 

 

 

 

     

 0800 002 002 (N. Ireland) 

 

Gas Safe Engineer Registraon No.   

Gas Safe Engineer contact No. 

 

Gas Engineer Name 

 

Содержание RAVEL HE F-101 2 Series

Страница 1: ...fully operate the appliance and is aware of any cleaning or maintenance requirements RAVEL HE GAS LOG FIRE Model numbers F 101XX2 SLIDE for use on Natural Gas G20 at a supply pressure of 20 mbar in GB...

Страница 2: ...helf 7 Front glass removal and replacement 8 Connec ng the Appliance to the Gas Supply 9 Checking Opera on of Appliance 9 Comple ng the Installa on 10 Appliance Technical Informa on 11 Cleaning Instru...

Страница 3: ...s at a supply pressure of 20 mbar as marked on the data plate on the appliance and the carton This appliance is only to be installed into a builders opening which must be constructed of non combus ble...

Страница 4: ...nal ven la on may have to be provided This appliance must only be installed on to a suitable hearth with a minimum thickness of 12mm The appliance must not be installed directly onto carpet of other c...

Страница 5: ...diagram above The upper surface of the hearth must be a minimum of 50mm above the oor and should ideally protrude a minimum distance of 200mm out from the replace opening This is to provide a physica...

Страница 6: ...not use any permanent sealing substance as this will invalidate warranty as the appliance cannot be removed for periodical inspec ons Cable Fixing System Supplied as standard This appliance is best in...

Страница 7: ...s Ltd Combus8ble Shelf This appliance may be Ned below a surround with a combus ble shelf providing the following dimensional criteria is met There must be a minimum distance of 250mm from the top of...

Страница 8: ...that the seal around the top and two sides of the rebox is in good condi on and is securely a xed to the appliance If the seal is damaged or loose then it should be replaced rea xed before the glass...

Страница 9: ...pressure of the appliance by aNaching a pressure gauge to the test point of the appliance This connec on should take place when the appliance is OFF Ensure that gas is turned on at the gas meter and...

Страница 10: ...heat expansion and contrac on this is perfectly normal During the rst several hours of use an odour will be experienced this is normal and is the starch used in the manufacturing of the ceramic fuel b...

Страница 11: ...ing of these components should only be undertaken once the appliance is switched o and has been allowed to cool for a minimum period of one hour The components should be li ed carefully piece by piece...

Страница 12: ...ying components will require the removal of the burner tray The following informa on details the removal of this tray Once removed refer to the relevant sec on that follows detailing the removal of th...

Страница 13: ...ner tray in to the rebox see previous page Replacement of the Pilot 1 Remove the four 4 screws to remove the pilot cover 2 Remove the two 2 screws to release the pilot assembly from the burner tray 3...

Страница 14: ...total 4 screws 4 Remove the screws from the Burner Inlet Shield Panel total 8 screws 5 The injector can be removed and replaced 6 Re assemble in reverse order 7 Re assemble the burner tray into the r...

Страница 15: ...e pilot is lit keep the control lever pushed down fully for up to 10 seconds 3 Now slowly li the control lever to the symbol the pilot should remain lit and the central and front log burners will also...

Страница 16: ...n if it does not t easily then you are not ng the part correctly These instruc ons can also be followed to remove or reinstall the fuel bed a er cleaning This is a procedure that can be undertaken by...

Страница 17: ...17...

Страница 18: ...carton Note its orienta on for installa on in this picture Place log C on the burner tray base at the back of the re as shown in this picture Iden fy and remove Log D from the ceramic packing carton...

Страница 19: ...at the back of the re as shown in this picture Iden fy and remove Log E from the ceramic packing carton Note its orienta on for installa on in this picture Place log E on the burner tray base at the b...

Страница 20: ...carton Note its orienta on for installa on in this picture Place log A on the burner tray base at the back of the re as shown in this picture Iden fy and remove Log B from the ceramic packing carton...

Страница 21: ...at the back of the re as shown in this picture Iden fy and remove Log F from the ceramic packing carton Note its orienta on for installa on in this picture Place log F on the burner tray base at the b...

Страница 22: ...22 Place log G on the burner tray base at the back of the re as shown in this picture Iden fy and remove Log G from the ceramic packing carton Note its orienta on for installa on in this picture...

Страница 23: ...ing pressure on full rate Min 18 5 Ensure all other gas appliances are running on full rate mbar Complete relevant sec on of warranty forms complete with Gas Safe registra on details Instruct the cust...

Страница 24: ...as Safe Registered Installer Full details are provided in this manual Hearth Products Ltd Unit 14 Tollgate Industrial Estate Sta ord ST16 3SU Product Fiche Manufacturer Hearth Products Ltd Model No F...