34
Place the volcanic rock on top of the centre burner as shown. Ensure a 4-5 mm gap is le
between each piece. Then using
half
of the glowing ember wire supplied (Tools & FiBngs Pack),
ruffle between fingers to make it loose and about 20mm wide then align over the volcanic rock
as shown. Ensure no wire is placed within 25mm of the pilot assembly. Retain the other half of
the wire for replacement at annual service.
FUELBED
Place Log A in the orientaon shown ensuring it fits neatly into the locang features as shown below.
Place Log B onto the le raised burner as shown ensuring it fits securely.
INSTALLATION
INSTRUCTIONS
Содержание RAVEL 800CF
Страница 13: ...13 USER INSTRUCTIONS Place Log H onto the burner bed as shown Place Log I onto the burner bed as shown...
Страница 37: ...37 Place Log H onto the burner bed as shown Place Log I onto the burner bed as shown INSTALLATION INSTRUCTIONS...
Страница 54: ...54 This page is inten onally le blank...
Страница 55: ...55 This page is inten onally le blank...