background image

www.wika.com 

 

1.  INTRODUCTION 

This manual is intended as a guide to assist customers 
in the installation, and maintenance of WIKA instruments 
Monoblock Instrumentation Valves series (ball/needle). 

Before using any of these series valves, read the entire 
Installation  and  Operation  Manual  (IOM)  carefully  and 
make sure you understand everything. 

If in doubt, please consult with WIKA Instruments Italia’s 
technical dept. 

WARNINGS & SAFETY 
INSTRUCTIONS 

 

WIKA instruments Monoblock Ball Valves must only 
be  used,  installed,  and  repaired  in  accordance  with 
these instructions. 

In the event of leakage or other malfunction, please 
contact    a  qualified  service  person,  as  a  continued 
operation  may  cause  system  failure  or  a  general 
hazard. 

Keep hands and objects away from the valve ports at 
all times. 

Before removing a valve from the line, always make 
sure  the  line  has  been  depressurized  and  drained. 
Cycle the valve a few times to relieve any pressure 
that could be trapped in the body cavity. 

Always  wear  Personal  Protective  Devices  when 
handling  a  valve  especially  with  toxic,  flammable  or 
corrosive fluids. 

Do not operate valves with visible leaks: valves have 
to be isolated and repaired. 

Valve  surface  temperature  may  become  extremely 
hot or cold due to operating conditions. Avoid any type 
of direct contact with the valve that may cause harm 
or injury. 

The  valves  should  be  used  in  a  well-designed, 
adequately supported piping system in order not to be 
subjected  to  undue  forces,  stresses  or  shock  loads 
during service. 

The system should be adequately protected to ensure 
that external  and  internal pressure  and  temperature 
limits do not exceed the valve limits. 

Never look into the valve bore while the valve is in a 
flow line. Pressure and fluids could escape from the 
valve causing harm or injury. 

The  Monoblock  ball  valves  are  fit  to  be  used 
completely open or completely closed: therefore they 
shall not be used for flow lamination. 

Monoblock  ball  valves  are  not  designed  to  undergo 

full ∆P. Monoblock ball valves shall be operated with 
maximum 4bar (60psi) ∆P. 

Always use WIKA original spare parts. 

2.  WARRANTY CONDITIONS

 

It  is  suggested  to  always  check  the  contract  for 
clarification about warranty terms and conditions. 

Warranty will ever falls in case of: 

-

 

Dismantling  under  warranty  period  on 
customer own initiative; 

-

 

Product is used in an improper way; 

-

 

Careless handling; 

-

 

Damage from external causes; 

-

 

Alteration/modification from original design; 

-

 

Excessive wear; 

-

 

Use out of design parameters; 

If  a  malfunction  occurs  during  the  warranty  period, 
please  contact  the  nearest  WIKA  dealer  for  the  best 
solution. 

 

 

Sizes included: 

 ½” – ¾” – 1” – 1” ½ – 2”  
DN 15 – 25 – 40 – 50 

 
Series: 

 

Single block (IBF1) 

 

Single  Block  and  bleed  or  SBB 
(IBF2, IBM2) 

 

Double  block  and  bleed  or  DBB 
(IBF3, IBM3, IBS3, IBJ4) 

 

 

 

 

 

Содержание IBF1

Страница 1: ...REV A PAG 1 9 MONOBLOCK INSTRUMENTATION VALVES Models IBF1 IBF2 IBF3 IBM IBS IBJ INSTALLATION OPERATING MAINTENANCE MANUAL A 25 10 21 Prima emissione Sostituisce MTUT001VPEN Santimaria A Rigo F Chiari...

Страница 2: ...EXTERNAL TIGHTNESS 3 7 3 CONTROL OF INTERNAL TIGHTNESS ONLY DBB SERIES 3 8 MAINTENANCE 4 8 1 MAINTENANCE WITHOUT DISASSEMBLY 4 8 2 MAINTENANCE WITH DISASSEMBLY 4 9 DISASSEMBLY 4 9 1 REPLACEMENT OF CL...

Страница 3: ...y type of direct contact with the valve that may cause harm or injury The valves should be used in a well designed adequately supported piping system in order not to be subjected to undue forces stres...

Страница 4: ...ise to open handle is parallel to flow line and 90 counter clockwise to close handle is perpendicular to flow line The bleed line should be in closed position while flow line is in open position and o...

Страница 5: ...cess fluid cycle the valve few times to ensure the pressurization of the body cavity After the pressurization set the valve in the required position 7 3 Check of external tightness Valves have been al...

Страница 6: ...f the valve bore flange connection threaded connections ball stem etc Seals replacement replace seals and seats of the complete valve for proper operation We suggest the use of WIKA Instruments origin...

Страница 7: ...and the stem nut tight the nut 8 Place levers in closed position 9 Place the ball and maintaining the lever in close position to prevent the ball from falling 10 Place second seat fig 1 4 and then th...

Страница 8: ...erating conditions 12 TIGHTENING TORQUES 12 1 Flanges bolts Tightening Torque 12 2 Stem tightening torque There is not a value for stem tightening torque Nuts have to be screwed up to the end then the...

Страница 9: ...www wika com 7 WIKA INSTRUMENTS ITALIA Srl Via Bernarde 11 1 36047 Montegaldella VI Italy Tel 39 0444 635801...

Отзывы: