29
5 Connecting to power supply
WIKA Operating Instructions - Process pressure transmitter CPT-2x
8. Tighten the compression nut of the cable entry gland. The seal
ring must completely encircle the cable
9. Unscrew the blind plug on the Master, screw in the supplied cable
gland
10. Connection cable to Master, see steps 3 to 8
11. Screw the housing lid back on
The electrical connection is finished.
5.3 Single chamber housing
The following illustration applies to the non-Ex, Ex-ia and Ex-d-ia
version.
5 6 7 8
4
2
1
connect to Master
Fig. 22: Wiring plan CPT-2x Slave sensor
1 To the Master sensor
2 Ground terminal for connection of the cable screening
2)
Electronics and connec-
tion compartment
2)
Connect shielding here. Connect ground terminal on the outside of the hous-
ing to ground as prescribed. The two terminals are galvanically connected.