Kunststoffschweißtechnik
Foundation: 2207, 2208, DIN 16932 German association for welding
Use for:
ASM160 / ASM 315 / ASM 355
OD 50 - 315
1 kp = 10 N
time to
change-
reach full
over
welding
cool-down time
0,10 (PP)
time
pressure
pressure in
T
desired
temperature
time
The values apply for the butt welding of pipes according to DVS 2207, 2208 DIN 16932
They are guide values for saddle welding; they may deviate and must be redetermined
if necessary!
pipe
pipe
SDR
bead-up
circular
heat-up
max.
time welding
cool-
diameter wall
force
bead
time
change-
to reach
force
down
OD
(s)
[kp]
min.
[s]
over
welding
[kp]
time
[mm]
[mm]
[daN]
[mm]
time
pressure [daN]
[min]
[s]
[s]
welding area
in welding area
P (N/mm²)
bead-up
heat-up
Additional to the given bead-up force and to the welding force the moving force of the support must be added !
Table for PP
The standard value for heating element temperature is 210° C +/- 10° C.
The
smaller
the pipe wall the
higher
the temperature.
280
6,9
41
60
0,5
173
6
7
60
12
280
8,6
33
74
1,0
197
6
8
74
15
280
10,7
26
91
1,0
227
7
10
91
18
280
15,9
17,6
132
1,0
292
8
14
132
26
280
25,4
11
204
1,5
394
11
22
204
39
280
38,3
7,4
291
2,5
493
14
33
291
57
315
7,7
41
75
1,0
185
6
8
75
13
315
9,7
33
94
1,0
213
7
9
94
16
315
12,1
26
116
1,0
246
7
11
116
20
315
17,9
17,6
168
1,0
317
9
16
168
28
315
28,6
11
258
2,0
420
12
24
258
44
Remaining under the cool-down time for up to 50% is allowed under the following conditions:
•
prefabrication under workshop conditions
•
low additional pressure at unclamping
•
no additional pressure during further cooling down
•
load onto the workpieces only after being completely cooled down
•
Join parts with wall thickness
≥
15 mm
25.03.2014
Working instructions WIDOS ASM 160 / ASM 315 / ASM 355
Page 27 / 6 of 45