8
2. Level the blower housing with leveling screws in mounting
hooks, using a level across bottom of blower housing.
3. Remove the metal grease filter and secure the blower
housing with one screw in the bottom hole located in the rear
of the blower.
Connect Vent System
Vented Installations Only
1. Fit vent system over transition piece.
2. Seal connection with clamps.
Non-vented (recirculating) Installation
1. Assemble the 3 parts of the deflector with 2 - 3.5 x 6.5 screws
provided. The assembled deflector should be sized to fit the
width of the vent cover bracket installed earlier.
2. Connect the deflector to the vent cover bracket using
4 - 3.5 x 6.5 screws provided.
3. Measure length of 8" (20.3 cm) vent needed to connect the
transition to the deflector.
NOTE: Vent should fit up inside deflector a minimum of
1" (2.5 cm).
4. Install vent between the transition and the deflector.
5. Seal all connections with clamps.
Make Electrical Connection
1. Disconnect power.
2. Remove terminal box cover.
3. Remove the knockout.
4. Install the UL listed or CSA approved strain relief.
A. Rear of blower housing
B. Bottom 5 x 35 screw hole
A. Vent cover bracket width
B. Deflector
C. 3.5 x 6.5 mm screws
A. Vent cover bracket
B. 3.5 x 6.5 mm screws
A
B
A
B
C
A
B
A. Knockout
B. Terminal box cover
A. ½" conduit
B. Terminal box cover
C. UL listed or CSA approved strain relief
D. Green (or bare) wire connected to yellow-green wire
E. White wires
F. Black wires
WARNING
Electrical Shock Hazard
Disconnect power before servicing.
Replace all parts and panels before operating.
Failure to do so can result in death or electrical shock.
A
B
A
B
C
D
E
F
Содержание W10018010
Страница 12: ...12 WIRING DIAGRAM TRANSFORMER ...