3-15
8.
Measure the new evaporator inlet and
outlet tubes, and cut the existing lines to
the proper length.
9.
Lift the evaporator out of the front air duct.
NOTE: Make sure that when you install
the new evaporator the small tabs seat
properly in the air duct guides on both
sides.
Pull
Out
Evaporator
Lift Evaporator
Out Of Guide
Содержание R-94
Страница 4: ... iv NOTES ...
Страница 36: ...CORPORATION ...