9
Complete Installation
1.
Install vent cover.
■
When using both upper and lower vent cover, push lower
cover down onto hood and lift upper cover to ceiling and
install screws.
■
For reduced ceiling height installations, using the upper or
lower vent cover, push cover down onto hood and snap
vent into place around vent cover bracket.
A
B
A. Upper vent cover
B. Lower vent cover
Check Operation
1.
Check operation of the range hood by turning the power on.
2.
Move the light switch to the “1” position. The light should
turn on.
3.
Move the light switch to the “0” position. The light should
turn off.
4.
Move the blower switch to the “1” position for low speed.
“2” position for medium speed. “3” position for high speed.
5.
Move the blower switch to the “0” position. The blower
should turn off.
6.
If range hood does not operate, check that the circuit breaker
has not been tripped of the house fuse blown. Disconnect
power supply and check that the wiring is correct.
O I
O 1 2 3
A
A. Light switch
B. Blower switch
B
Install Filters
1.
For non-vented (recirculating) installations, install charcoal
filter over grill on blower housing and turn filter handle
clockwise. Repeat with other charcoal filter.
2.
For all installations, insert back edge of metal filter into rear
channel of the filter opening.
3.
Push handle toward the rear and push filter up.
4.
Pull filter towards the front and insert into front channel.
C
C
A. Blower housing
B. Handle
C. Charcoal filters
B
A