
B E L 5 0 7 X L L
A R G E
C
A S E
T
I L T
P
A C K I N G
S
T A T I O N
5
65-15-6 5/11/07
I
NSTALLATION OF THE
BEL 505XL P
ACKING
S
TATION
Uncrate the machine and remove any packing material from the interior or supports from underneath used
to protect components during shipping.
Install the legs at each of the three positions on the machine frame with one nut and washer for each leg
underneath the frame and another nut and washer on the inside.
L
EVELING THE
M
ACHINE
The base of the frame should be made level to ensure personnel safety, provide optimum performance and
avoid frame stress.
The machine should be securely mounted to adjoining equipment to prevent the machine moving as it
operates.
A
IR
C
ONNECTION
S
S
A
A
F
F
E
E
T
T
Y
Y
C
C
A
A
U
U
T
T
I
I
O
O
N
N
Make sure that the red emergency stop button is pushed down (off)
before connecting an air supply to the machine.
The air may come from either a separate source or by tapping off the supply of an adjoining case sealer.
The supply must be clean factory air and must be lubricated by the unit on the machine.
Air pressure should be set to 80 psi. for most applications with a minimum setting of 65 psi. and
maximum of 100 psi.