WD-6C
Rev. 7.0 (202202)
Installation instructions
9
3.2.3
Power supply
Power supply connections are made by qualified personnel in a way that complies
with local and national regulations. The machine’s capacity requirements are
stipulated in TECHNICAL SPECIFICATIONS.
3.2.4
Water
Water connections are made by qualified personnel in a way that complies with
local and national regulations. The machine’s capacity requirements are
stipulated in TECHNICAL SPECIFICATIONS.
3.2.5
Drain/waste pipe
There must be a drain pipe with an effective trap for the machine’s waste water
and for water used for rinse cleaning. The machine’s capacity requirements for
drainage are stipulated in TECHNICAL SPECIFICATIONS.
3.2.6
Space for servicing
A 1-metre area should be left clear in front of the machine for servicing purposes.
Depending on if the machine has different accessories, there may also be such a
requirement at the infeed and outfeed ends as well as above the machine.
Содержание WD-6C
Страница 2: ......