Mounting and connecting the Control Box
18
1. Mount the control box (2) with
suitable screws and dowels for the
resp. surface.
Preferably mount the control box
approx. 150 cm above the ground.
Make sure the control box is not
exposed to direct sunlight, rain,
snow or direct water jet (high pres-
sure water jet etc.).
2. Unscrew the lock nuts of the strain
relief and insert the power cable of the gate opener from below
into the control box. Pull enough cable and tighten the lock nuts
of the strain relief.
The cables are labelled with small flags. Please observe the
flags and arrange them correctly.
Order of the cables for Gate Opener 1:
Red cable to +Motor1
Black cable to
–Motor1
Blue cable to ULT1
Green cable to COM
Yellow cable to DLT1.
Order of the cables for Gate Opener 2:
Red cable to +Motor2
Black cable to
–Motor2
Blue cable to ULT2
Green cable to COM
Yellow cable to DLT2.
Opener 1
Opener 2
Screws and
dowels
(not
included)
Содержание 85 27 06
Страница 17: ...Mounting 13...
Страница 38: ...Connection Diagram for Accessory 34...