Installation Guide
5. Installation
5.2 Ultrastar Data102 Installation Procedure
Figure 17:
Front Rail Release Clip Operation
g.
Use a level to make sure that the rails are aligned properly.
h.
Follow these steps for the other outer rail.
Step 7 :
Install the rail mounting hardware, starting with the uppermost rack mounting hole of the 4U
space on the front of the rack.
CMA Standard:
a.
Install one cagenut at the uppermost mounting hole of the 4U space that the enclosure will
occupy.
b.
If the Ultrastar Data102 will be installed in a rack for shipping purposes, install four more M5
cage nuts in the holes 3-6 of the 4U space. These will receive the M5 x 12mm T15 Flat Head
Torx screws that secure the enclosure to the rack with the shipping bracket.
44