24
6650-2260
Point-to-point application
TX RX
TX RX
CH 1
CH 1
LON
Network
LON
Network
Configure the network
…
Check that it is running correctly with the electrical serial network.
Prepare the fibre optical network
…
Connect the fibre links between the units.
…
Connect the power supply to all units.
…
The Fibre links should be in operation, indicated by active CH 1 LED's.
…
Connect the LON equipment to the LRW-102PP.
…
The point-to-point application is up and running.
Unit 1
Unit 2
Unit 3
CH2
Bi-di 1550 nm
Bi-di 1550 nm
Bi-di 1550 nm
CH1
Bi-di 1310 nm
Bi-di 1310 nm
Bi-di 1310 nm
Redundant ring with Bi-di transceivers
PWR
CH 1
TD
FL L
RD
FL R
PKT
CH 2
CH
1
COM +V
A +V
B COM
TX RX
LON
ST
ATUS
N2 N1
L2 L1
LR
W
-100 Series
CH
2
TX
RX
1
2
2
1
PWR
CH 1
TD
FL L
RD
FL R
PKT
CH 2
CH
1
COM +V
A +V
B COM
TX RX
LON
ST
ATUS
N2 N1
L2 L1
LR
W
-100 Series
CH
2
TX
RX
1
2
2
1
PWR
CH 1
TD
FL L
RD
FL R
PKT
CH 2
CH
1
COM +V
A +V
B COM
TX RX
LON
ST
ATUS
N2 N1
L2 L1
LR
W
-100 Series
CH
2
TX
RX
1
2
2
1