23
6650-2260
Multidrop application
Prepare the fibre optical network:
…
Multidrop, mid units (CH 1 & CH 2). Set switch S2:2 to ON.
…
Multidrop, end units (CH 1 only). All switches should be set to OFF.
…
Connect the fibre links between the units.
…
Connect the power supply to all units.
…
The Fibre links should be in operation, indicated by active CH 1 and CH 2 LED's.
…
Connect the LON equipment to the LRW-102.
…
The Multidrop application is up and running.
Note!
LRW-102PP can be used as end unit.
TX
RX
TX
RX
TX
RX
TX
RX
TX
RX
TX
RX
TX
RX
TX
RX
CH 2
CH 1
CH 2
CH 1
CH 2
CH 1
CH 2
CH 1
LON
Network
LON
Network
LON
Network
LON
Network