Safety
To ensure the safety of man and machine
easy and risk-minimised installation/handling was taken into consideration
during construction. Thus, the handling machine is subject to all applicable DIN
EN standards. Operator training and instruction are required and further reduce
the safety risk.
7.2
Assembly
The complete assembly and first start-up is carried out exclusively by the
manufacturer. The machines are subjected to a thorough test run and are
supplied only after successful acceptance.
7.3
First start-up
Before first start-up, check the entire vehicle for possible
damage.