37
925.476.4 - EN
INSTRUCTIONS PERTAINING TO THE INSTALLER
This boiler is designed to heat water at a lower than boiling temperature at atmospheric pressure. The boiler must be
connected to a central heating system and to a domestic hot water supply system in compliance with its performances
and output power.
Have the boiler installed by a Qualified Service Engineer and ensure the following operations are accomplished:
a) careful checking that the boiler is fit for operation with the type of gas available. For more details see the notice on the
packaging and the label on the appliance itself.
b) careful checking that the flue terminal draft is appropriate; that the terminal is not obstructed and that no other appliance
exhaust gases are expelled through the same flue duct, unless the flue is especially designed to collect the exhaust gas
coming from more than one appliance, in conformity with the laws and regulations in force.
c) careful checking that, in case the flue has been connected to pre-existing flue ducts, thorough cleaning has been carried
out in that residual combustion products may come off during operation of the boiler and obstruct the flue duct.
To ensure correct operation of the appliance and avoid invalidating the guarantee, observe the following precautions:
1. Hot water circuit:
1.1.
If the water hardness is greater than 20 °F (1 °F = 10 mg calcium carbonate per litre of water) a polyphosphate or
comparable treatment system responding to current regulations.
1.2.
Domestic Hot Water circuit must be thoroughly flushed after the installation of the appliance and before its use.
1.3.
The materials used for the domestic hot water circuit of the product comply with Directive 98/83/EC.
2. Heating circuit
2.1. new system
Before proceeding with installation of the boiler, the system must be cleaned and flushed out thoroughly to eliminate
residual thread-cutting swarf, solder and solvents if any, using suitable proprietary products.
To avoid damaging metal, plastic and rubber parts, use only neutral cleaners, i.e. non-acid and non alkaline. The
recommended products for cleaning are:
SENTINEL X300 or X400 and FERNOX heating circuit restore. To use this product proceeding strictly in accordance
with the maker’s directions.
2.2. existing system
Before proceeding with installation of the boiler, the system must be cleaned and flushed out to remove sludge
and contaminants, using suitable proprietary products as described in 2.1.
To avoid damaging metal, plastic and rubber parts, use only neutral cleaners, i.e. non-acid and non-alkaline such
as SENTINEL X100 and FERNOX heating circuit protective. To use this product proceeding strictly in accordance
with the maker’s directions.
Remember that the presence of foreign matter in the heating system can adversely affect the operation of the
boiler (e.g. overheating and noisy operation of the heat exchanger).
Failure to observe the above will render the guarantee null and void
.
IMPORTANT:
when connecting an instantaneous boiler (mixed) to a system with solar panels, the maximum tem-
perature of the DHW at the boiler inlet must not be greater than:
• 60°C
with a flow limiting device
• 70°C
without a flow limiting device
The following remarks and instructions are addressed to Service Engineers to help them carry out a faultless installation. In-
structions regarding lighting and operation of the boiler are contained in the ‘Instructions pertaining to the user’ section.
Note that installation, maintenance and operation of the domestic gas appliances must be performed exclusively by quali-
fied personnel in compliance with current standards.
Please note the following:
* This boiler can be connected to any type of double- or single feeding pipe convector plates, radiators, thermoconvec-
tors. Design the system sections as usual though taking into account the available output / pump head performances,
as shown in section 24.
* Do not leave any packaging components (plastic bags, polystyrene, etc.) within children’s reach as they are a potential
source of danger.
* Initial lighting of the boiler must be effected by a Qualified Service Engineer.
Failure to observe the above will render the guarantee null and void.
11. GENERAL INFORMATION
12. INSTRUCTIONS PRIOR TO INSTALLATION
Содержание star master 240 Fi
Страница 83: ...83 925 476 4 RU 3 2 2 1 25 3 4 0801_0201 CG_2015...
Страница 84: ...84 925 476 4 RU 4 1 C C ECO COMFORT ECO P eco COMFORT a PM12 0 20 3 2 3 1 0603_1301 2 4 2...
Страница 85: ...85 925 476 4 RU 5 OFF OFF 3 2 OFF 6 7 LPG 5 C 30 C 8 3 0 7 1 5 OFF 3 2 3 0503_2405...
Страница 88: ...88 925 476 4 RU 13 3 4 14 6 0606_2603 240 Fi minimo 5 0512_0505 CG_1769 3 4 1 2 3 4 240 Fi CG_1725 0904_1801...
Страница 91: ...91 925 476 4 RU 9 9 0904_1501 9a 9b 0904_1508 0904_1509...
Страница 93: ...93 925 476 4 RU 16 230 3 HAR H05 VV F 3x0 75 2 8 10 10 bra 0512_0508 CG1770 2 L N L N 1 2 17 10 1 2...
Страница 98: ...98 925 476 4 RU Venturi Venrturi 03E 9 9 9 2 20 0 5 C 3 20 F17 C 30 5 C 30 C 25E 9 1 24 24 3 NTC 5 20 21...
Страница 102: ...102 925 476 4 RU 19 29 30 19 Molykote 111 28 NTC Cillit FFW AL Beckinser HF AL 19 CG_1825 0605_3001...
Страница 104: ...104 925 476 4 RU 32 NTC C M N R G V B V CG_1741 0904_1507 26...
Страница 106: ...106 925 476 4 RU...
Страница 107: ...107 925 476 4 RU...