42
925.476.4 - EN
INSTRUCTIONS PERTAINING TO THE INSTALLER
15.5 SEPARATED HORIZONTAL FLUE TERMINALS INSTALLATION OPTIONS
15.6 SEPARATED VERTICAL FLUE TERMINALS INSTALLATION OPTIONS
IMPORTANT
-
Ensure a minimum downward slope of 1 cm
towards the outside per each metre of duct length.
In the event of installation of the condensate collection kit, the angle of drain duct must be directed toward the boiler.
NOTE:
For C52 types, terminals for combustion air suction and combustion product extraction must never be fitted on
opposite walls of the building.
The maximum length of the suction duct must be 10 metres.
If the flue duct exceeds 6 m, the condensate collection kit (supplied as an accessory) must be fitted close to the boiler.
L max = 10 m
CG_1644 / 0503_0911
L max =
10 m
(L1 + L2) max =
30 m
CG_1643 / 0503_2201
15.4 SPLIT FLUE OVERALL DIMENSIONS
0504_1806/CG_1794
Содержание star master 240 Fi
Страница 83: ...83 925 476 4 RU 3 2 2 1 25 3 4 0801_0201 CG_2015...
Страница 84: ...84 925 476 4 RU 4 1 C C ECO COMFORT ECO P eco COMFORT a PM12 0 20 3 2 3 1 0603_1301 2 4 2...
Страница 85: ...85 925 476 4 RU 5 OFF OFF 3 2 OFF 6 7 LPG 5 C 30 C 8 3 0 7 1 5 OFF 3 2 3 0503_2405...
Страница 88: ...88 925 476 4 RU 13 3 4 14 6 0606_2603 240 Fi minimo 5 0512_0505 CG_1769 3 4 1 2 3 4 240 Fi CG_1725 0904_1801...
Страница 91: ...91 925 476 4 RU 9 9 0904_1501 9a 9b 0904_1508 0904_1509...
Страница 93: ...93 925 476 4 RU 16 230 3 HAR H05 VV F 3x0 75 2 8 10 10 bra 0512_0508 CG1770 2 L N L N 1 2 17 10 1 2...
Страница 98: ...98 925 476 4 RU Venturi Venrturi 03E 9 9 9 2 20 0 5 C 3 20 F17 C 30 5 C 30 C 25E 9 1 24 24 3 NTC 5 20 21...
Страница 102: ...102 925 476 4 RU 19 29 30 19 Molykote 111 28 NTC Cillit FFW AL Beckinser HF AL 19 CG_1825 0605_3001...
Страница 104: ...104 925 476 4 RU 32 NTC C M N R G V B V CG_1741 0904_1507 26...
Страница 106: ...106 925 476 4 RU...
Страница 107: ...107 925 476 4 RU...