31
926.275.1 - GB
INSTRUCTIONS FOR USERS
This boiler has been designed to heat water to a temperature lower than boiling point at atmospheric pressure. It must
be connected to a central heating system and to a domestic hot water supply system according to its performance and
power output.
Before having the boiler installed by a qualified service engineer, make sure the following operations are performed:
a) Make sure that the boiler is adjusted to use the type of gas delivered by the gas supply. To do this, check the markings
on the packaging and the rating plate on the appliance.
b) Make sure that the flue terminal draft is appropriate, that the terminal is not obstructed and that no exhaust gases
from other appliances are expelled through the same flue duct, unless the latter has been specially designed to collect
exhaust gas from more than one appliance, in compliance with current laws and regulations.
c) Make sure that, if the boiler is connected to existing flue ducts, these have been thoroughly cleaned as residual products
of combustion may detach from the walls during operation and obstruct the flow of fumes.
d) To ensure correct operation and maintain the warranty, observe the following precautions:
1. DHw circuit:
1.1.
If the water is harder than 20 °F (1 °F = 10 mg calcium carbonate per litre of water), install a polyphosphate dispenser
or an equivalent treatment system, compliant with current regulations.
1.2.
Thoroughly flush the system after installation of the appliance and before use.
1.3.
The materials used for the domestic hot water circuit of the product comply with Directive 98/83/EC.
2. Heating circuit
2.1. new system
Before proceeding with installation of the boiler, the system must be cleaned and flushed to eliminate residual
thread-cutting swarf, solder and any solvents, using suitable proprietary products. To avoid damaging metal, plastic
and rubber parts, only use neutral cleaners, i.e. non-acid and non alkaline. Recommended cleaning products are:
SENTINEL X300 or X400 and FERNOX Regenerator for heating circuits. Use these products in strict compliance
with the manufacturers’ instructions.
2.2. existing plant:
Before installing the boiler, drain the system and clean it to remove sludge and contaminants, using suitable
proprietary products as described in section 2.1. To avoid damaging metal, plastic and rubber parts, use only neutral
cleaners, i.e. non-acid and non-alkaline such as SENTINEL X100 and FERNOX Protector for heating circuits. Use
these products in strict compliance with the manufacturers’ instructions. Remember that the presence of foreign
bodies in the heating system can adversely affect boiler operation (e.g. overheating and excessive noise of the
heat exchanger).
Failure to observe the above will render the guarantee null and void
.
1. INSTRUCTIONS PRIOR TO INSTALLATION
Initial lighting of the boiler must be carried out by an authorised Service Engineer who must first ensure that:
a) the rated data correspond to the supply (electricity, water and gas) data;
b) the installation complies with current laws and regulations;
c) the appliance is correctly connected to the power supply and earthed.
The names of the authorised Service Centres are indicated in the attached sheet.
Failure to observe the above will render the guarantee null and void.
Prior to commissioning, remove the protective plastic coating from the boiler. Do not use any tools or abrasive detergents
to do this as you may damage the painted surfaces.
The instructions shall state the substance of the following:
This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental
capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concer-
ning use of the appliance by a person responsible for their safety.
Children should be supervised to ensure that they do not play with the appliance.
2. INSTRUCTIONS PRIOR TO COMMISSIONING
Содержание quasar D
Страница 29: ......
Страница 55: ......
Страница 81: ......
Страница 107: ......
Страница 110: ...110 926 275 1 RU WE STEN 2 3 1 0805_2302 CG_2072...
Страница 111: ...111 926 275 1 RU 4 5 1 3 1 1 1...
Страница 112: ...112 926 275 1 RU 5 OFF 9 7 8 0 7 1 5 2 6 2 24 F 24 CG_2115 0902_0603 A B...
Страница 116: ...116 926 275 1 RU 16 6 0503_0905 CG1638 7 LAS 90 360 45 18 1 90 1 45 0 5 90 0 CG_2117 0902_1801 A 24 F 0 1 1 5...
Страница 120: ...120 926 275 1 RU 9 0712_1208 CG_2008 17 230 3 3x0 75 2 8 9 2 L N L N 1 2 18 9 1 2 1 2...
Страница 125: ...125 926 275 1 RU 24 F 03 10 24 03 10 2 2 3 2 0 5 3 30 5 30 25 10 24 10 3 NTC 22...
Страница 126: ...126 926 275 1 RU 23 13 9912070100 2 2 19 2 2 24 1 25 0902_0606...
Страница 127: ...127 926 275 1 RU 26 Kt 2 TM Te 2 0505_3002 TM Te curbe kt 27...
Страница 128: ...128 926 275 1 RU 28 24 f 17 CG_2110 0902_0607 1 NTC 2 3 4 5 6 7 8 9 10 11 12 13 NTC 14 15 16 17 18 19 20 3 21 22...
Страница 129: ...129 926 275 1 RU 24 18 0809_0202 CG_2082 1 NTC 2 3 4 5 6 7 8 9 10 NTC 11 12 13 14 15 16 17 3 18 19...
Страница 130: ...130 926 275 1 RU 29 24 F C N R G V B V NTC NTC CG_2113 0905_2601...
Страница 131: ...131 926 275 1 RU 24 C N R G V B V NTC NTC CG_2116 0905_2602...
Страница 133: ...133 926 275 1 RU 90 a 6 2 100 2 b c d 50 oce 9306231145 P O N M A B D H I L G F E C oce 9402251015 oce 9402251030...
Страница 135: ......
Страница 161: ......
Страница 164: ...164 926 275 1 GR 1 2 3 4 2 3 RESET 1 Reset 0805_2302 CG_2072...
Страница 165: ...165 926 275 1 GR 4 5 1 3 1 1 C 1 C...
Страница 166: ...166 926 275 1 GR 5 OFF 9 7 8 GPL 0 7 1 5 bar 3 6 2 24 F 24 CG_2115 0902_0603 A B...
Страница 174: ...174 926 275 1 GR 9 0712_1208 CG_2008 17 230 V 3 mm HAR H05 VV F 3x0 75 mm2 8 mm 9 2 L N L N 1 2 18 9 1 2...
Страница 179: ...179 926 275 1 GR 24F venturi venturi E03 10 24 03 10 2 2 3 2 0 5 bar 180 30 5 C 30 C 25 10 24 10 3 bar NTC 22...
Страница 180: ...180 926 275 1 GR 23 13 9912070100 2 CO2 CO 3 cm 19 C1 2 2 CO2 CO 24 1 25 l h mH 2 O 0902_0606...
Страница 181: ...181 926 275 1 GR 26 faston kt 1 TM Te 2 0505_3002 TM Te kt 27...
Страница 182: ...182 926 275 1 GR 28 17 24 f CG_2110 0902_0607 1 NTC 2 3 4 5 6 7 8 9 10 11 12 13 NTC 14 15 16 17 18 19 20 21 A by pass 22...
Страница 183: ...183 926 275 1 GR 18 24 0809_0202 CG_2082 1 NTC 2 3 4 5 6 7 8 9 10 NTC 11 12 13 14 15 16 17 18 A by pass 19...
Страница 184: ...184 926 275 1 GR 29 24 F C M N R G V B V NTC NTC CG_2113 0905_2601...
Страница 185: ...185 926 275 1 GR 24 C M N R G V B V NTC NTC CG_2116 0905_2602...
Страница 187: ...187 926 275 1 GR...
Страница 188: ...ed 2 05 09 926 275 1 36061 BASSANO DEL GRAPPA VI ITALIA Via Trozzetti 20 Tel 0424 517111 Telefax 0424 38089...