37
926.275.1 - GB
INSTRUCTIONS FOR FITTERS
13. INSTALLAzIONE DELLA CALDAIA
14. INSTALLING THE BOILER
After deciding the exact location of the boiler, fix the template to the
wall.
Connect the system to the gas and water inlets present on the lower bar of
the template. Fit two G3/4 taps (delivery and return) on the central heating
circuit; these taps make it possible to carry out important operations on
the system without draining it completely. If you are either installing the
boiler on an existing system or replacing one, as well as the above, fit a
settling tank under the boiler on the system return line in order to collect
any deposits and scale circulating in the system after flushing. After fixing
the boiler to the template, connect the flue and air ducts, supplied as
accessories, as described in the following sections.
If the model
24
natural draught boiler is installed, connected it to the flue
with a metal pipe resistant to normal mechanical stress, heat, products
of combustion and relative condensate.
Figure 4
0902_0604 / CG_2011
24 F - 24
14. DIMENSIONI CALDAIA
15. DIMENSIONS OF BOILER
Figure 5
24
24 F
CG_2009 / 0903_0201
CG_2009 / 0903_0202
Содержание quasar D
Страница 29: ......
Страница 55: ......
Страница 81: ......
Страница 107: ......
Страница 110: ...110 926 275 1 RU WE STEN 2 3 1 0805_2302 CG_2072...
Страница 111: ...111 926 275 1 RU 4 5 1 3 1 1 1...
Страница 112: ...112 926 275 1 RU 5 OFF 9 7 8 0 7 1 5 2 6 2 24 F 24 CG_2115 0902_0603 A B...
Страница 116: ...116 926 275 1 RU 16 6 0503_0905 CG1638 7 LAS 90 360 45 18 1 90 1 45 0 5 90 0 CG_2117 0902_1801 A 24 F 0 1 1 5...
Страница 120: ...120 926 275 1 RU 9 0712_1208 CG_2008 17 230 3 3x0 75 2 8 9 2 L N L N 1 2 18 9 1 2 1 2...
Страница 125: ...125 926 275 1 RU 24 F 03 10 24 03 10 2 2 3 2 0 5 3 30 5 30 25 10 24 10 3 NTC 22...
Страница 126: ...126 926 275 1 RU 23 13 9912070100 2 2 19 2 2 24 1 25 0902_0606...
Страница 127: ...127 926 275 1 RU 26 Kt 2 TM Te 2 0505_3002 TM Te curbe kt 27...
Страница 128: ...128 926 275 1 RU 28 24 f 17 CG_2110 0902_0607 1 NTC 2 3 4 5 6 7 8 9 10 11 12 13 NTC 14 15 16 17 18 19 20 3 21 22...
Страница 129: ...129 926 275 1 RU 24 18 0809_0202 CG_2082 1 NTC 2 3 4 5 6 7 8 9 10 NTC 11 12 13 14 15 16 17 3 18 19...
Страница 130: ...130 926 275 1 RU 29 24 F C N R G V B V NTC NTC CG_2113 0905_2601...
Страница 131: ...131 926 275 1 RU 24 C N R G V B V NTC NTC CG_2116 0905_2602...
Страница 133: ...133 926 275 1 RU 90 a 6 2 100 2 b c d 50 oce 9306231145 P O N M A B D H I L G F E C oce 9402251015 oce 9402251030...
Страница 135: ......
Страница 161: ......
Страница 164: ...164 926 275 1 GR 1 2 3 4 2 3 RESET 1 Reset 0805_2302 CG_2072...
Страница 165: ...165 926 275 1 GR 4 5 1 3 1 1 C 1 C...
Страница 166: ...166 926 275 1 GR 5 OFF 9 7 8 GPL 0 7 1 5 bar 3 6 2 24 F 24 CG_2115 0902_0603 A B...
Страница 174: ...174 926 275 1 GR 9 0712_1208 CG_2008 17 230 V 3 mm HAR H05 VV F 3x0 75 mm2 8 mm 9 2 L N L N 1 2 18 9 1 2...
Страница 179: ...179 926 275 1 GR 24F venturi venturi E03 10 24 03 10 2 2 3 2 0 5 bar 180 30 5 C 30 C 25 10 24 10 3 bar NTC 22...
Страница 180: ...180 926 275 1 GR 23 13 9912070100 2 CO2 CO 3 cm 19 C1 2 2 CO2 CO 24 1 25 l h mH 2 O 0902_0606...
Страница 181: ...181 926 275 1 GR 26 faston kt 1 TM Te 2 0505_3002 TM Te kt 27...
Страница 182: ...182 926 275 1 GR 28 17 24 f CG_2110 0902_0607 1 NTC 2 3 4 5 6 7 8 9 10 11 12 13 NTC 14 15 16 17 18 19 20 21 A by pass 22...
Страница 183: ...183 926 275 1 GR 18 24 0809_0202 CG_2082 1 NTC 2 3 4 5 6 7 8 9 10 NTC 11 12 13 14 15 16 17 18 A by pass 19...
Страница 184: ...184 926 275 1 GR 29 24 F C M N R G V B V NTC NTC CG_2113 0905_2601...
Страница 185: ...185 926 275 1 GR 24 C M N R G V B V NTC NTC CG_2116 0905_2602...
Страница 187: ...187 926 275 1 GR...
Страница 188: ...ed 2 05 09 926 275 1 36061 BASSANO DEL GRAPPA VI ITALIA Via Trozzetti 20 Tel 0424 517111 Telefax 0424 38089...