7113126.02 (3-08/13)
Burner injector-pressure table
1.24 F - 24 F
Gas type
G20
G31
Injector diameter (mm)
1.35
0.85
Burner pressure (mbar*)
REDUCED HEAT OUTPUT
2.1
5.4
Burner pressure (mbar*)
RATED HEAT OUTPUT
11.8
28.8
N° injectors
11
* 1 mbar = 10.197 mm H
2
O
D) Electronically calibrate the gas valve
D1) Electronically adjust to reduced heat output:
• set parameter
F08-F09 = 0
following the procedure described in the SETTING PARAMETERS section;
• open a hot water tap that can provide a flow rate of at least 10 litres a minute or make sure there is maximum heat demand;
• slowly increase (not more than 2 points at a time) the value of parameter
F45
until the pressure read with the pressure gauge
increases; then reduce the value of
F45
by 2 points and press to save.
D2) Electronically adjust to nominal heat output:
• set parameters
F08-F09 = 100
,
F48 = 70
;
• open a hot water tap that can provide a flow rate of at least 10 litres a minute or make sure there is maximum heat demand;
• slowly increase (not more than 2 points at a time) the value of parameter
F48
until the pressure read with the pressure gauge
reaches the value indicated in the burner pressure/injectors table (NOMINAL HEAT OUTPUT); then increase the value of
F48
by 2 points;
• set parameters
F64 = 0
,
F18 = 0
and press to save;
• turn off the two-pole switch to disconnect the boiler from the power supply for at least 5 seconds;
• put the front panel back in place.
E) Final checks
• Note down the conversion on the boiler rating plate, specifying the type of gas and indicating that calibration was performed.
After performing electronic calibration, set parameter F08-F09 as shown in the table below.
If
flashes on the display when calibrating the gas valve, disconnect the boiler from the power supply and repeat the
calibration procedure starting from point B).
12.2 REPLACING THE GAS VALVE
When replacing the gas valve, perform the following operations:
• switch off the boiler;
• close the gas inlet valve;
• replace the gas valve;
• open the gas inlet valve and make sure there are no gas leaks;
• perform the operations described in points B, C, D of the GAS CONVERSION section.
12.3 GAS VALVE CALIBRATION
To calibrate the gas valve, perform the operations described in points B, C, D of the GAS CONVERSION section.
12.4 REPLACING THE ELECTRONIC BOARD
When replacing the electronic valve, perform the following operations:
• disconnect the boiler from the mains power supply.
• remove the front panel of the boiler;
• replace the electronic board;
• power the boiler;
• set parameters F03 and F12 as described in the SETTING PARAMETERS section according to the boiler model indicated on
the rating plate.
24 F
1.24 F
G20 - G25.1
G31
G20 - G25.1
G31
F08
055
060
100
F09
100
100
Содержание Pulsar E
Страница 23: ...23 7113126 01 1 05 13 ...
Страница 45: ...45 7113126 01 1 05 13 ...
Страница 67: ...67 7113126 01 1 05 13 ...
Страница 89: ...89 7113126 01 1 05 13 ...
Страница 111: ...111 T E L E P Í T Ő I R é s z h u 7113126 02 3 08 13 ...
Страница 133: ...133 7113126 01 1 05 13 ...
Страница 155: ...155 7113126 01 1 05 13 ...
Страница 168: ...7113126 02 3 08 13 168 S E C T I O N C 30 ...
Страница 169: ...169 S E C T I O N C 7113126 02 3 08 13 116 ...
Страница 170: ...7113126 02 3 08 13 170 S E C T I O N D ...
Страница 173: ...173 S E C T I O N F 7113126 02 3 08 13 CG_2518 M M2 A D C E B F G A ext ...
Страница 174: ...7113126 02 3 08 13 174 S E C T I O N F 2 1 D A C G H E F B ...