background image

Inst

alla

tI

on, opera

tI

on and ma

Inten

ance 

man

U

al

An ISO 9001-2000 Certified Company

Utica Boilers

P.O. Box 4729 
Utica, NY 13504-4729 

www.uticaboilers.com

SERIES MGB

 

CAST IRON GAS FIRED BOILERS

FOR FORCED HOT WATER

 P/N 

37611601

, Rev. A  [07/08]

MODEL NUMBERS:

MGB50

MGB75

MGB100

MGB125

MGB150

MGB175

MGB200

MGB250

MGB300

Содержание MGB 100

Страница 1: ...9001 2000 Certified Company Utica Boilers P O Box 4729 Utica NY 13504 4729 www uticaboilers com SERIES MGB CAST IRON GAS FIRED BOILERS FOR FORCED HOT WATER P N 37611601 Rev A 07 08 MODEL NUMBERS MGB50 MGB75 MGB100 MGB125 MGB150 MGB175 MGB200 MGB250 MGB300 ...

Страница 2: ...quipped supplied or specified components may result in property damage personal injury or the loss of life 4 TO THE OWNER Installation and service of this boiler must be performed by a qualified installer 5 TO THE INSTALLER Leave all instructions with the boiler for future reference 6 When this product is installed in the Common wealth of Massachusetts the installation must be performed by a Licen...

Страница 3: ...20 feet In special cases where conditions permit chimney height may be reduced to 10 feet Refer to the latest revision of NFGC part 11 Electric service to be 120 Volts 15 Amps 60 Hz The MEA number for the this boiler is 19 79 E 1 For elevations above 2000 feet ratings should be reduced at a rate of 4 for each 1000 feet above sea level 2 Base on 170 temperature in radiators 3 Tank sized for non fer...

Страница 4: ...e lighting and other performance 4 criteria with the gas manifold and control assembly on the boiler per the latest revision of ANSI Z21 13 CGA 4 9 The boiler shall be installed such that the gas ignition 5 system components are protected from water drip ping spraying rain etc during appliance operation and service circulator replacement condensate trap control replacement etc Locate boiler on lev...

Страница 5: ...Gas Code When a boiler is installed in an unconfined space in a 3 building of tight construction air for combustion and ven tilation must be obtained from outdoors or from spaces freely communicating with the outdoors A permanent opening or openings having a total free area of not less than 1 square inch per 5000 Btu per hour of total input rating of all appliances shall be provided Ducts may be u...

Страница 6: ...inch from the back and 6 inches from the front of the boiler The opening shall directly communicate with the outdoors or shall communicate through a verti cal or horizontal duct to the outdoors or spaces crawl or attic that freely communicate with the outdoors The openings must have a minimum free area of 1 square inch per 3000 Btu per hour of the total input rating of all equipment located in the...

Страница 7: ...eating boiler During heating cycle open valves A and B close valves C and D During cooling cycle open valves C and D close valves A and B Maintain a minimum clearance of one inch to hot water C pipes When the boiler is connected to heating coils located in air 2 handling units where they may be exposed to refrigerated air circulation the boiler piping system MUST BE sup plied with flow control val...

Страница 8: ...ation This method of piping however is not typically required for baseboard heat ing systems Typical installations where bypass piping is used are as follows This method is used to protect boilers from condensation A forming due to low temperature return water Generally noticed in large converted gravity systems or other large water volume systems Figure 6 These methods are used to protect systems...

Страница 9: ...ALVE HOSE BIB FLOW CONTROL VALVE EXPANSION TANK BOILER DHW CIRCULATOR CH CIRCULATOR PRIORITY ZONE CIRCULATOR EXPANSION TANK WATER INLET FLOW CONTROL VAVLE SHUT OFF VALVE PRESSURE REDUCER VALVE CHECK VALVE BALL VALVE AIR SEPARATOR ZONE VALVE HOSE BIB SINGLE ZONE SYSTEM WITH DHW PRIORITY MULTIZONE SYSTEM WITH CIRCU LATORS AND DHW PRIORITY CONNECTING SUPPLY AND RETURN PIPING Figure 7 Figure 8 ...

Страница 10: ...PRIORITY ZONE BOILER WATER INLET CH DHW SYSTEM CIRCULATOR USE FULL PORT ZONE VALVE FOR OPTIMUM TANK PERFORMANCE CONSIDER USING ZONE CIRCULATOR SEE FIGURE 5 ZONE 4 CIRCULATOR SHUT OFF VALVE PRESSURE REDUCER VALVE CHECK VALVE EXPANSION TANK AIR SEPARATOR ZONE VALVE HOSE BIB FLOW CONTROL VALVE Figure 9 Figure 10 CONNECTING SUPPLY AND RETURN PIPING MULTIZONE SYSTEM WITH ZONE VALVES AND DHW PRIORITY WI...

Страница 11: ...turn doors win dows exhaust fans fireplace dampers and any other gas burning appliances to their previous condition of use Any improper operation of the common venting system 7 All installations of boilers and venting should be done only by a qualified expert and in accordance with the appropriate manual Installing or venting a boiler or any other gas appliance with improper methods or materials m...

Страница 12: ...3 hole on Damper Motor frame Tighten locknut onto Damper wire harness connector 4 Plug Damper connector into socket on Damper Motor 5 frame Replace Damper Motor cover and wire Damper in accor 6 dance with Figure 11 DAMPER INSTRUCTIONS Ensure that only the boiler is serviced by the Vent Damp 1 er Figure 12 ACCEPTABLE VENT DAMPER LOCATIONS UN ACCEPTABLE DAMPER LOCATIONS BOILER HOT WATER HEATER CHIMN...

Страница 13: ...y piping system during 4 any pressure testing of the gas piping After reconnecting leak test gas connection and boiler piping before placing boiler back into operation Natural Gas Propane Min Supply Pressure 5 w c 11 w c Max Supply Pressure 14 w c 14 w c Manifold Pressure 3 5 w c 10 5 w c ELECTRICAL WIRING See wiring diagrams on the following two pages for details Electrical wiring must conform wi...

Страница 14: ...14 Wiring Diagram 24V Standing Pilot VR8200 OR VR8300 ...

Страница 15: ...15 Wiring Diagram Intermittent Ignition ...

Страница 16: ...call your gas supplier from a neighbor s phone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire department CAUTION C Use only your hand to push in or turn the gas control knob Never use tools If the knob will not push in or turn by hand don t try to repair it Call a qualified service technician Force or attempted repair may result in a fire or explosion D ...

Страница 17: ...H COVER SCREW OUTLET PRESSURE TAP TAP PRESSURE INLET GAS INLET GAS OUTLET TH TR ON OFF PILOT Figure 16 NOTE Somegascontrolknobscannotbeturnedfrom PILOT to OFF unless knob is pushed in slightly DO NOT FORCE Wait 5 minutes to clear out any gas If you then smell 6 gas STOP Follow What To Do If You Smell Gas If you don t smell gas go to the next step Find pilot Follow metal tube from gas control Depen...

Страница 18: ...g errors can cause improper and dangerous operation CAUTION Verify proper operation after service The service agency or owner should make certain the system is filled with water to minimum pressure and open air vents if used to expel any air that may have accumulated in the sys tem Check the entire piping system and if any leaks appear have them repaired Circulators need to be checked and maintain...

Страница 19: ...h of the tip of the pilot thermocouple ignition sensing electrode or mercury sen sor Figure 21 IGNITION ELECTRODE 3 8 TO 1 2 IN FLAME Figure 21 To adjust the pilot flame remove the pilot adjustment cover screw Figures 14 16 on previous pages and turn the inner adjustment screw counterclockwise to increase or clockwise to decrease pilot flame Be sure to replace cover screw after adjustment to preve...

Страница 20: ... be changed if the final manifold pressure varies more than plus or minus 0 3 inches water column from the specified pressure Primary air adjustment is not necessary therefore air shutters are not furnished as standard equipment Air shutters can be furnished on request where required by local codes or conditions Check Safety Control Circuit after burner adjustments are made for satisfactory operat...

Страница 21: ...21 ...

Страница 22: ...05 MANIFOLD 300 356 2 1 06 Item Description Part Qty 5 SCREW 20 X SELF TAP HW 005 01 4 6 GAS VALVE VR8200H 50 150 24V NAT VG 003 05 1 GAS VALVE VR8200H 50 300 24V LP VG00307 GAS VALVE VR8204H 50 150 SPARK NAT VG01101 GAS VALVE VR8304H4 175 300 SPARK NAT VG01103 GAS VALVE VR8304 50 300 SPARK LP VG01104 GAS VALVE VR8300H4 250 300 24V NAT VG01201 GAS VALVE VR8300H4 175 200 24V NAT VG01202 7 ORIFICE 3...

Страница 23: ...100 1 Center Section 125 150 2 Center Section 175 200 3 Center Section 250 4 Center Section 300 6 Item Part No Description Qty 7 100 2 2 01 Left Hand Section 1 8 43300976 Push Nipple 2 Mach 050 2 Push Nipple 2 Mach 075 100 4 Push Nipple 2 Mach 125 150 6 Push Nipple 2 Mach 175 200 8 Push Nipple 2 Mach 250 10 Push Nipple 2 Mach 300 12 9 3461601 Baffle 075 175 Only 2 Fully Assembled Heat Exchangers 1...

Страница 24: ...1201 1 PANEL BASE 75 100 3161202 PANEL BASE 125 150 3161203 PANEL BASE 175 200 3161204 PANEL BASE 250 3161205 PANEL BASE 300 3161206 Item DESCRIPTION Part Number Qty 6 PANEL RIGHT 50 200 3162705 1 PANEL RIGHT 225 300 3162703 7 PANEL REAR 50 3162601 1 PANEL REAR 75 100 3162602 PANEL REAR 125 150 3162603 PANEL REAR 175 200 3162604 PANEL REAR 250 3162605 PANEL REAR 300 3162606 8 FLUE COL 50 3462101 1...

Страница 25: ... 02 Natural Gas Q345A PILOT 1 240007096 LP Q345A Pilot Included with 3 Pilot Tube Assembly Kit above CONTINUOUS PILOT Item Part No Description Qty 1 109007296 PILOT BRACKET ASSEMBLY 1 2 HW 005 01 BRACKET SCREW 2 3 1520001 THERMOCOUPLE Q309 1 4 14615005 PILOT TUBING 1 8 x 24 1 5 14662098 Natural Gas Q314A PILOT 1 240007285 LP Q314A Pilot Included with 3 Pilot Tube Assembly Kit above 1 1 5 5 3 4 4 2...

Страница 26: ...6 07 1 5 DRAIN SHORT HW 016 03 1 6 PIPE TEE 1 1 4X3 4X1 1 4 PF 008 03 1 7 PIPE 1 1 4 CLOSE NPL PF 006 01 1 8 WIRE LOW VOLTAGE DAMPER 375 1 14 01 1 9 HARNESS CIRCULATOR 72 37519501 1 10 CONTROL L8148E1257 AQUASTAT 1010002 1 11 RELIEF VALVE 30 VR 001 01 1 12 WELL 3 4 X3 AQ 020 01 1 13 GAUGE THERALTIMETER GA 001 00 1 14 PIPE NPL 3 4 X4 PF 005 11 1 15 PIPE ELBOW 3 4 90 PF 002 04 1 16 CLAMP 3600 WHITE ...

Страница 27: ...ption Part Qty 1 TEMP SENSOR BRACKET 3262001 1 2 CONTROL FIXED TEMPERATURE THERMO ROLLOUT SWITCH AQ02101 1 3 SCREW 6 X HEX HD HW06501 2 The rollout switch is located on the base and flue collector NOTE The quantities above are for each switch ...

Страница 28: ...P O Box 4729 Utica NY 13504 4729 ...

Отзывы: