8
6.4 - Installation instructions
1.
Prepare the fixing center distances at the ceiling for each casing (see section "Dimensions" for fixing center distances).
2.
Fix the suspension kit (optional) composed of threaded rods only or threaded rods and hanger rails.
3.
In the case that the suspension kit by threaded rods only is supplied, install the casing as indicated in the drawing below.
In the other case, fix the casing on the hanger rails with the aid of fixing screws, see drawing below.
4.
On the double casing units, assemble the two casing with the help of factory fitted assembling clamps and screws.
5.
Secure the unit in its final position and
level it with a spirit level
to assure proper drainage and operation.
6.
Unit must be mounted in such a way that water will flow toward drain connection.
6 - Installation (continued)
Assembly of two casings
Suspension
kit hanger
rail
Factory fitted assembling
clamps and screws
Final assembly
Suspension kit by threaded rods only (optional)
1
2
3
4
5
2
1
Lifting ring
2
M10 nut
3
M10 threaded rod
4
Rubber isolator
5
M10 washer
Suspension kit by threaded rods and hanger rails (optional)
1
Lifting ring
2
M10 nut
3
M10 threaded rod
4
Rubber isolator
5
M10 washer
6
Hanger rail
7
Rail fixing screws
Threaded rod
M10
Weight 75 kg
Rubber isolator
Washer/nut
M10
1
2
3
4
5
2
6
7