![Werner Dosiertechnik Sauna Plus 8 Basic Скачать руководство пользователя страница 37](http://html.mh-extra.com/html/werner-dosiertechnik/sauna-plus-8-basic/sauna-plus-8-basic_operating-instructions-manual_957252037.webp)
Commissioning Protocol IP-004-EN
Sauna Plus 8 and Sauna Plus 8 Basic
Z:\org-wdt\02 Qualitätsmanagement\ISO 9001\MS - Originale - Formuale, Prüfbericht etc\WDT Inbetriebnahmeprotokolle IP\WDT-IP-004-EN-Sauna Plus 8+Sauna Plus 8 Basic FO 01.docx
Page 1 of 1
This protocol is to be completed by the commissioning technician! Without a completed and signed commissioning
protocol, all warranty claims become void!
Object:
Date: __/__/____
City, street, house number:
Device type:
Year of manufacture:
Serial number:
Activity
Completed Comment
1
Commissioning
1.1
Roller carrier inserted
1.2
Device checked for correct installation
1.3
Water inlet flushed, checked and opened
1.4
Device and lines checked for leaks
1.5
Does the splash line run completely empty?
Yes,
Optional system separation unit not required
No,
Optional system separation unit required and installed
No,
Optional system separation unit required but not
installed
no operation permitted, according to
DIN EN 1717!
1.6
Fragrance container connected
1.7
All test programmes checked
1.8
Settings made and operation mode selected
1.9
Flow pressure of supply water line checked
Attention! Other consumers in the vicinity of the automatic splash
system may influence the flow pressure!
...... bar
1.10
Automatic sauna splash system started
1.11
Device checked for correct operation
1.12
Water and fragrance quantities adjusted to cabin size
(manufacturer's instructions for fragrance quantity observed!)
2
Other
2.1
Operating instructions reviewed and handed over
2.2
Service and operating personnel instructed
Additional remarks:
Commissioning and instruction carried out by:
Instructed persons:
Signature of commissioner:
Countersigned by operator: