28
16. Commissioning guide
16.1 Note
Only trained personnel following the safety regulations may commission the Fieldbus Gateway.
16.2 Components
You will require the following components to commission the Fieldbus Gateway:
•
Fieldbus Gateway
•
Connection cable from Gateway to the process
•
Connector for Ethernet connection to the Gateway
•
Ethernet cable (this cable is generally available on site!)
•
10…33 V DC power supply (DIN 19240)
•
User manual (the instruction manual can be ordered separately or downloaded free of charge from our homepage at www.
wenglor.com).
16.3 Installation
The Fieldbus Gateway - FE module features protection type IP20 and is thus suitable for switch cabinet use. The device is desig-
ned for snapping onto a 35 mm DIN-rail.
16.4 Dimensional drawing Fieldbus Gateway - Fast Ethernet
16.5 Commissioning
It is essential that you perform the following steps during commissioning in order to ensure that the module operates correctly:
16.6 Ethernet connection
Connect the device to the Ethernet network at the interface labeled "RJ45 Ethernet".
16.7 Connection to the process device
Please also read the manual for the process device when commissioning the process device.