background image

Assemble casters (#2 and #3) to the base assembly (#1).

1.   Align the swivel casters (#2) with the bolt holes on the base assembly (#1).

2.   Attach the casters to the base assembly using 3/8" carriage bolt (#12) 

and lock nut (#13). 

(Detail A)

Note:   

The same caster type (swivel or rigid) must be assembled to 

each base assemblies.  

3.   Align the rigid casters (#3) with the bolt holes on the remaining 

base assembly (#1).

4.  Repeat step 2.

Assemble the cross member (#7) to the base assemblies (#1)

.

5. Lay the base assemblies on end.

6. Align the cross member (#7) to the bolts located on the bottom of the base assemblies. 

(Detail B)

7. Secure the cross member to the base assemblies using 3/8" lock nuts (#13).

13

5

A

SSEMBLY

Detail A

Detail B

12

2

2

3

7

1

13

Содержание OnBoard Bass Drum

Страница 1: ...lowing pages If you need additional information contact the Wenger Corporation using the information below CONTENTS Important User Information 2 Safety 3 Tools Required 4 Fastener List 4 Parts List 4...

Страница 2: ...ndirect special incidental or consequential damages resulting from the use or defect of this manual The information in this document is not intended to cover all possible conditions and situations tha...

Страница 3: ...one foot rise or drop in a 12 foot horizontal distance Because swivel casters move in any direction the operator must move the cart slowly and have a clear view to avoid obstructions and individuals s...

Страница 4: ...L PIN 6 DRUM GONG TUBE LOOP 18 BUNGEE CORD KIT 19 TUBE PLUG 1 7 5 6 Carriage Bolt 3 8 16 x 1 Lock Nut 3 8 9 16 Wrench or 9 16 Socket with Ratchet 3 8 Wrench Small Phillips Screwdriver 3 16 Allen Wrenc...

Страница 5: ...or rigid must be assembled to each base assemblies 3 Align the rigid casters 3 with the bolt holes on the remaining base assembly 1 4 Repeat step 2 Assemble the cross member 7 to the base assemblies 1...

Страница 6: ...ng the adjustable pivot weldment 5 Slide both end of the drum gong loop halves between the brackets of the adjustable pivot weldment The sprocket to the outside of the loop Note The adjustable pivot w...

Страница 7: ...F 18 Once you have one side of the drum gong loop assembly aligned into the base assembly pull back gently on the opposite base assembly towards the top to align the bolt on the adjustable pivot weld...

Страница 8: ...ngee cord Make a loop at the end of the bungee cord Push the loop through the bottom of the hook bringing it up in front of the hook Detail G Wrap the loop around to the back of the hook Detail H Pull...

Отзывы: