
18
Installation (continued)
This procedure is for securing island mount lockers to the structure.
See the previous page for securing wall mount lockers.
This instruction is for standard installation only.
For seismic installation, see the instructions included with the Seismic Island Kit 243A028.
STOP
Secure Island Mount Lockers
Because materials and construction of walls can vary, fasteners for attaching the lockers to the structure
are not provided� The installer must choose the appropriate fastener and follow the manufacturer’s instructions�
See “Fasteners - Not Supplied" on page 5 for more information�
NOTE:
The end of every locker bank must be secured to the floor.
NOTE:
Make sure all the lockers are secured together before
attaching them to the floor.
1� At the ends of the locker bank, attach one
wall bracket (13) to the bottom inside of
each locker using
#8 x 5/8" pan head screws (14)�
The brackets have extra holes for the
best fit.
2� Secure the bracket to the locker
using #8 x 5/8" pan head screws (14)�
3. Secure the bracket to the floor using
the appropriate fasteners�
4� Reattach the bottom shelves in the
lockers�
5� Install any optional equipment
as shown on the following pages
before continuing to
“Finalize Installation" on page 23�
In addition to the sides and backs of the lockers being
secured, the lockers must also be attached to the floor.
!
CAUTION
Attach to the
locker using
#8 x 5/8"
Pan Head Screws
(14)
Wall
Bracket
(14)
Slide
shelf in
Reattach
screws
Inferior or improperly installed fasteners
could cause the lockers to tip over.
!
WARNING