- 15 -
Installation steps
Step 1
- Alignment of height-adjustable feet with spirit level.
- Slightly carve off concrete in siphon area, if necessary.
Step 2
- Press the flat seal from above into the drainage outlet, press siphon body [7] from below onto the
drain and fasten tightly with the drainage valve [6] from above.
- Connect the sewage hose to the siphon body [7] and connect with in-house sewage system.
- Insert cleaning bit [5], press the cover [4] on.
Step 3
- The tub is to be aligned with vertical walls in a 90 degree angle by means of a spirit level.
- The joints are to be filled with silicone. Select type of silicone in accordance with construction
material used. Please mind curing times.
Allow 24 hours for silicone
to dry before first use.
24
hours
Max. 150 kg
Содержание Summer 12051354
Страница 4: ... 4 Verpackungsinhalt 1 1 x Duschwanne 2 1 x Siphon Garnitur ...
Страница 6: ... 6 4 Chromabdeckung 5 entnehmbarer Reinigungseinsatz 6 Ablaufventil 7 Siphonkörper 4 5 6 7 ...
Страница 11: ... 11 This product is heavy and may require two people to install Tools required ...
Страница 12: ... 12 Box contents 1 1 x Shower tub 2 1 x Siphon set ...
Страница 14: ... 14 4 Chrome cover 5 Removable cleaning insert 6 Drainage valve 7 Siphon body 4 5 6 7 ...
Страница 19: ... 19 En raison du poids important de ce produit le montage peut nécessiter deux personnes Outils nécessaires ...
Страница 20: ... 20 Contenu de l emballage 1 1 x receveur de douche 2 1 x garniture de ...
Страница 22: ... 22 4 couverture chrome 5 élément d épuration amovible 6 Valve d évacuation 7 Corps du siphon 4 5 6 7 ...
Страница 28: ... 28 Contenuto della confezione 1 1 x piatto doccia 2 1 x kit sifone ...
Страница 30: ... 30 4 copertura cromata 5 inserto di pulizia estraibile 6 valvola di scarico 7 sifone 4 5 6 7 ...