Safety instructions and warnings
14/52
1.5.5
Commissioning
Initial commissioning will be undertaken by the manufacturer's own service
personnel or by an authorized service company. The unit will be handed over
ready for use.
If the unit has not been used for a longer period of time then it must first be
inspected by our customer service staff or by another authorized company
before being put back into operation again.
The unit is only to be used if it is working correctly!
None of the safety devices (e.g. switch) or safety warnings are to be removed
or deactivated as this would impair the safe operation of the unit!
The unit may only be put into operation if the well has been filled with the
specified amount of water.
The unit may not be connected to the power supply during filling!
The unit may no longer be moved once the well has been filled!
A water cooling system must be connected to the unit if it is to be used for
more than 1 hour per day at maximum pressure. The pressure hoses must
not be removed. Please contact the customer service department without fail
before putting the unit into operation - see page 2.
The unit may only be operated with the pressure hose included in the scope
of delivery.
A water shut-off valve must be used.
High frequency mobile communication systems can interfere with the way the
unit functions.
Heat therapy devices (microwave therapy devices, etc.) installed in the vicinity
may lead to electromagnetic interference. Contact our customer service de-
partment if this happens – see page 2.
Venting
The tank must be vented 3 days after commissioning or after it has been
initially filled – see page 42. After this, venting is unnecessary unless leak-
ages occur and the tank has to be topped up.
The unit may no longer be used in the event of water loss (puddles on the
floor). Please inform our customer service department – see page 2.
1.5.6
Operation and maintenance
Error-free operation, maintenance and service are required in order to ensure
that the health and safety of the users is not endangered during operation and
to ensure that the unit is in a fault-free operating condition.
Always abide by the information and recommendations given in this operating
manual. Please ensure that the intervals for the inspection, maintenance and
service are complied with. Maintenance work must be carried out in accord-
ance with the checklist supplied by our customer service department.
Unauthorized modifications and changes to the unit and its control unit are
prohibited. Failure to comply with this voids the operating licence!
To avoid hazards, the unit must not be used if the mains power cable is dam-
aged. A damaged mains connection cable must be replaced immediately.