Wells F-101 Скачать руководство пользователя страница 7

INSTALLATION (continued) 

WARNING:  

Electric Shock hazard 

 

All servicing requiring access to non-insulated electrical components must be          
performed by a factory authorized  technician. 
DO NOT open any access panel which requires the use of tools.  Failure to follow this 
warning can result in severe electrical shock.

 

CAUTION: 

Risk of 
Damage 

 

DO NOT connect or energize 
this appliance until all        
installation instructions are 
read and followed.  Damage 
to the  appliance will result if 
these instructions are not  
followed. 
 

CAUTION: 

Electrical Shock   
Hazard 

 

The ground lug of fryers must 
be connected to a suitable   
building electric ground. 
 

IMPORTANT: 

Damage due to being 
connected to the wrong     
voltage or phase is NOT    
covered by warranty.

 

IMPORTANT:  

Refer to the 

General Layout Data 

packed with the fryer 

for wire size requirements and other installation data. 

 
F-55 STS FRYER ELECTRICAL INSTALLATION 

 

F-55 fryers must be connected directly to an appropriately sized electric 
circuit.  Conduit and strain relief must be provided by the electrician.   
F-55 fryers require a 208VAC or 240VAC 20 amp three-phase circuit 
with ground. 

 

Raise the element head, remove the frypot and the cover at the inside 
rear of the fryer to gain access to the terminal block.  The electrical inlet 
is  provided by a knock-out in the rear panel. 

 

If an equipment shutdown interface is required by local fire code, the 
flame sensor terminal block may be accessed by removing the cover at 
the inside rear of the fryer   Replace the jumper of the terminal block 
with wiring to a normally closed contact of the building fire management 
system. 
DO NOT connect power to the flame sensor terminal block.  Wiring and 
contacts must be capable of handling 20 amps. 
 

F-85 FRYER ELECTRICAL INSTALLATION 

 

F-85 fryers must be connected directly to an appropriately sized electric 
circuit.  Conduit and strain relief must be provided by the electrician.   
F-85 fryers require either a 240VAC 50 amp single phase circuit with 
ground;  a 208VAC or 240VAC 40 amp three phase circuit with ground, 
or a 480VAC 20 amp three phase circuit with ground. Units are shipped 
from the factory wired for three phase.  Conversion of 240VAC units to  
single phase must be performed in the field by the electrician. 

 

Raise the element head, remove the frypot and the cover at the inside 
rear of the fryer to gain access to the terminal block.  The electrical inlet 
is  provided by a knock-out in the rear panel. 
 

F-101 and F-1725 FRYER ELECTRICAL INSTALLATION 

 

F-101 and F-1725 fryers must be connected directly to an appropriately 
sized electric circuit.  Conduit and strain relief must be provided by the 
electrician.   F-101 fryers require a 208VAC or 240VAC 40 amp three 
phase circuit with ground, 
F-1725 fryers require a 208VAC or 240VAC 50 amp three phase circuit 
with ground, Units are shipped from the factory wired for three phase.  
F-101 and F-1725 fryers are not approved for conversion to single 
phase. 

 

Raise the element head, remove the frypot and the cover at the inside 
rear of the fryer to gain access to the terminal block.  The electrical inlet 
is  provided by a knock-out in the rear panel. 

Содержание F-101

Страница 1: ...nsible for TRAINING OPERATORS of this appliance Additional manuals are available from your WELLS DEALER THIS MANUAL MUST BE READ AND UNDERSTOOD BY ALL PERSONS USING OR INSTALLING THIS APPLIANCE Contac...

Страница 2: ...ordance with electrical code requirements and wiring diagrams supplied with the equipment are not covered by this warranty 4 Replacement of items subject to normal wear to include such items as knobs...

Страница 3: ...the information needed to properly install this appliance and to use and care for the appliance in a manner which will ensure its optimum performance TABLE OF CONTENTS INTRODUCTION 1 MODEL VOLTS AMPS...

Страница 4: ...FEATURES OPERATING CONTROLS 2 Fig 1 Countertop Fryer with Safety Test System Features Operating Controls F 85 Shown F 55STS F 101 and F1725 are Similar...

Страница 5: ...n Refer to the General Layout Data packed with the fryer for wire size requirements clearances and other important installation data This manual is considered to be a permanent part of the appliance T...

Страница 6: ...85 2 ea FRY BASKETS 4 ea ADJUSTABLE LEGS SETUP Setup the appliance only on a firm level non combustible surface Verify local codes for requirements Concrete tile terrazzo or metal surfaces are recomm...

Страница 7: ...rear of the fryer Replace the jumper of the terminal block with wiring to a normally closed contact of the building fire management system DO NOT connect power to the flame sensor terminal block Wiri...

Страница 8: ...no more than 1 2 full with food product a DO NOT overload fry baskets For best results load baskets uniformly to half full b Using the basket handle lower the baskets into the hot oil c When food is c...

Страница 9: ...rmometer is in the TEST ZONE the test is complete The function of the hi limit thermostat is normal Reset the hi limit thermostat and resume normal operation If the test thermometer rises above the TE...

Страница 10: ...t of the frypot NOTE The element support rod is spring loaded When the element head is raised the support rod will automatically swing into position to keep the element head raised 3 Allow the oil to...

Страница 11: ...FF 2 Allow the oil to cool to a safe temperature 120 F or 50 C 3 Raise the element head and lift the frypot out of the fryer by the frypot handles 4 Dispose of the used oil in an approved oil disposal...

Страница 12: ...between the heating element and the thermobulb temperature control thermostat will cause inconsistent temperatures Clean the element so that oil may circulate freely between the element and the therm...

Страница 13: ...thorized service agency or call Wells Manufacturing Co 2 Erik Circle P O Box 280 Verdi NV 89439 phone 775 345 0444 fax 888 492 2783 Service Parts Dept Service Parts Department can supply you with the...

Страница 14: ......

Отзывы: