5.4 Gas supply
The gas side connection must only be carried out by an approved gas installer. All
country specific guidelines and local regulations imposed by the gas supply company
must be observed.
The gas characteristics must match the data given on the name plate of the boiler.
The condensing boiler is factory preset to Natural Gas E (G20).
Conversion from Natural Gas to Liquid Petroleum Gas (see Ch. 7.3).
Gas connection pressure
The gas connection pressure must be within the following ranges:
Natural Gas E/H
17.0 …
20
… 25.0 mbar
Natural Gas LL
20.0 …
25
… 30.0 mbar
Liquid Petroleum Gas P (
P
n 37)
25.0 …
37
… 45.0 mbar
Liquid Petroleum Gas P (
P
n 50)
42.5 …
50
… 57.5 mbar
Commissioning outside of the pressure ranges to DIN EN 437 is not permitted.
Installing the gas supply
DANGER
Risk of explosion due to leaking gas
Gas leaks can lead to a build-up of explosive gas/air mixture. With an ignition source
present this can result in an explosion.
▶
The gas supply should be installed with care and all safety instructions should be
observed.
▶
Close all shut off devices prior to commencing work and protect from accidental
re-opening.
▶
Install gas supply pipes tension free.
If a thermal shut off device (TAE) is required:
▶
Install a thermal shut off device in front of the gas isolating valve, or install a gas
isolating valve with TAE.
▶
Install gas isolating valve.
▶
Connect gas supply to gas inlet.
Carry out soundness test of gas supply line and vent
Only the gas supply company or a contract installation company may carry out a
soundness test and vent the gas line.
Installation and operating instruction
Gas condensing boiler WTC-GB 90-A
5 Installation
83266502 • 1/2010-08 • La