26
4
4.9 Flue gas connection
Flue gas lines approved by planning law
The WTC is equipped with a concentric flue gas
connection Ø 125/80 located at the top of the unit. The
flue gases should be extracted via temperature and
corrosion resistant flue gas duct:
•
in vertical ducting
•
via external wall connections
•
for roof heating centres with vertical flue gas duct
•
air-flue gas chimney
The combustion air can be introduced:
•
from the boiler room (room air dependent operation)
•
by concentric pipe systems
(room air independent operation)
•
by non-closing supply air ducts
Only CE certificated or locally tested and approved flue
gas systems must be used.
The Weishaupt Flue gas - air - system WAL-PP,
see installation and operating manual WAL-PP, offers
approved kits and individual components.
The flue gas duct must be gas tight.
☞
Carry out soundness test.
Note:
If a
plastic
flue gas system is connected,
which is approved for flue gas temperatures
up to 80°C, the maximum flue gas
temperature must be set to 80°C. Use
parameter P33 (see Ch. 6.3.3). The
Weishaupt flue gas-air system WAL-PP is
approved for temperatures up to 120°C.
Flue gas connection
1
Boiler connection piece
2
Test point in the supply air aperture
3
Flue gas sampling point
1
2
3
Содержание WTC 45-A
Страница 75: ...75 A ...
Страница 84: ...84 A 5 01 5 02 5 03 5 09 5 14 5 13 5 05 5 04 5 06 5 04 5 10 5 12 5 11 5 09 5 08 5 07 5 09 ...
Страница 86: ...86 A 6 01 6 02 6 05 6 04 6 06 6 07 6 01 6 08 6 03 ...
Страница 88: ...88 A ...
Страница 89: ...89 A ...