69)
Prepare boiler
(continued)
Ramp
Pallet
Apply pressure only to jacket
corners when moving
Brackets
(right & left sides
Notch
SVF
™
Series 1
Commercial Condensing Gas-Fired Water Boiler
— Boiler Manual
Part number 550-100-250/0819
10
Figure 4
SVF
TM
2500
boiler on pallet, with ramp in position
Cold weather handling
— If boiler has been stored in a
very cold location (below 32°F) before installation, handle with
care until the pl
astic components come to room temperature.
4HEBOILERISHEAVY
. Use caution not to drop the boiler
or cause bodily injury while lift ing and handling.
Boiler supply, return and gas pipes
— Do not lift or
handle the boiler by the water or gas pipes. Do not push on
or apply weight to the pipes. Severe damage can be done to
the boiler.
Leave
the
PLASTICCOVERS
on the supply and return con-
nections and on the boiler vent and air adapters until ready
to att ach piping. Th
is will protect the fi tt ings surfaces from
damage and prevent debris from falling into the vent or air
adapter.
Uncrating the boiler
Do not drop the boiler. Damage to boiler components can
result. Leave the boiler on the crate pallet until ready to place
in fi nal location. Follow all uncrating instructions.
Failure to comply could result in severe personal injury, death
or substantial property damage.
1. See Figure 4 for the following.
2. Move the crate to a solid, level surface.
3. Th
ere must be room (the length of the boiler plus 76" for
ramp) at the piping end to place the ramp and roll the boiler
down off the crate pallet.
4. Make sure the crate is sitt ing securely.
5. Remove the ramp from the crate and place the end of the
ramp into the notch in the pallet as shown in Figure 4 .
6. Follow the uncrating instruction label to secure the ramp
to the pallet.
7. Remove the sixteen (16) screws and lag bolts from the eight
(8) shipping brackets.
Th
e boiler is heavy. Use caution when rolling
down ramp. Potential bodily injury or boiler
damage could be caused while handling. Th
e
boiler should be unloaded from the pallet on to
a solid, level surface.
Moving/handling the boiler
7HEN MOVING THE BOILER APPLY PRESSURE
/.,9ATTHEJACKETCORNERPOSTSORWATER
manifolds.
4HE BOILER IS HEAVY
. Use caution when rolling
down ramp. Potential bodily injury or boiler damage
could be caused while handling. Th
e boiler should be
unloaded from the pallet onto a solid, level surface.
Hex head bolts
3/8" wrench
Lag bolts
7/16" socket or
wrench