Weil-McLain SGO Series Скачать руководство пользователя страница 8

8

The procedures and information on pages 8 through 11 are intended 

only for a qualified service technician who has the necessary equipment to 
inspect and adjust boiler and burner. A homeowner should never attempt 
these procedures. Qualified service technician must read pages 2 and 3 before 
proceeding.

Any parts of the boiler furnished by Weil-McLain must be replaced by parts listed in 

Weil-McLain Boiler and Repair Parts Book.

Annual Service Check List

(follow 

i

n order l

i

sted below)

D

A
T

E

D

A
T

E

D

A
T

E

D

A
T

E

D

A
T

E

D

A
T

E

D

A
T

E

D

A
T

E

D

A
T

E

D

A
T

E

Comments

1

Check that bo

i

ler area 

i

s free from combust

i

ble

 mater

i

als, 

g

asol

i

ne and other flammable vapors

and l

i

qu

i

ds.

2

Check for and remove any obstruct

i

on to

combust

i

on and vent

i

lat

i

on a

i

r flow to bo

i

ler.

3

Check breech

i

n

g

 and ch

i

mney or vent for

obstruct

i

ons, dama

g

e, etc. Repa

i

r or replace as

necessary.

4

Clean bo

i

ler flueways. See pa

g

e 9.

5

Perform serv

i

ce on low water cutoff, rel

i

ef valve

and 

g

au

g

g

lass. See pa

g

e 11.

6

Check bo

i

ler and p

i

p

i

n

g

 for leaks and repa

i

i

f

found.

7

Inspect and adjust burner. See burner manual and:

- chan

g

e nozzle.

- check 

ig

n

i

t

i

on electrode sett

i

n

g

s.

- clean blower hous

i

n

g

 and wheel.

- make sure blower wheel turns freely.
- o

i

l burner motor 

i

f requ

i

red.

- clean a

i

i

nlet.

- clean or chan

g

e fuel f

i

lter and stra

i

ner.

8

Make sure bo

i

ler 

i

s f

i

lled to correct water level.

 See pa

g

e 10.

9

test equ

i

pment.

See pa

g

Start un

i

t and ver

i

fy combust

i

on sett

i

n

g

s w

i

th

combust

i

on   
10.

10

Ver

i

fy operat

i

on of all controls on bo

i

ler. See pa

g

e

11.

 

Annual Service Call Check List 

Part No. 550-141-830/1202

Содержание SGO Series

Страница 1: ...or future reference leave this manual with other boiler instructions in the envelope provided with the boiler Maintenance and Service Guide Part No 550 141 830 1202 SGO Series 3 Oil Fired Steam Boiler...

Страница 2: ...ine maintenance of boiler and system Pages 2 through 6 must be followed to assure proper operation of your boiler Page 7 lists common problems and possible corrections In addition it is your responsib...

Страница 3: ...gasoline See burner manual for proper fuel oil Do not attempt to start burner when excess oil has accumulated in combustion chamber when unit is full of vapor or when combus tion chamber is very hot D...

Страница 4: ...t type low water cutoff when used Refer to control manufacturer s instructions Scald potential Do not blow down low water cutoff unless blowdown piping has been installed according to Boiler Manual If...

Страница 5: ...team ReliefValve on back of boiler SGO with oat type low water cutoff 1 If burner does not re check for Switch on boiler or additional shut off switches turned off Fuses or breaker switch tripped Ther...

Страница 6: ...turned off Fuses or breaker switch tripped Thermostat set below room temperature Fuel valves turned off Not enough oil in tank to supply burner No water in gauge glass Start up SGO Boiler with Probe T...

Страница 7: ...pair clean or replace air vents or traps Water disappearing from gauge glass and back into system through return piping Incorrect Hartford Loop piping Have qualified service technician pipe boiler exa...

Страница 8: ...ds 2 Check for and remove any obstruction to combustion and ventilation air flow to boiler 3 Check breeching and chimney or vent for obstructions damage etc Repair or replace as necessary 4 Clean boil...

Страница 9: ...Move to the bottom of the ueways and clean up between the sections to reach pins left uncleaned in step 5 Thoroughly clean ueways between all pins at all angles Start on top of boiler nish from the b...

Страница 10: ...aps and air vents for proper opera tion 7 Process may need to be repeated after several weeks of operation L L L L Detailed Service Procedures To place in operation Follow information below to prevent...

Страница 11: ...cock The water level should immediately rise to its proper level 4 If gauge glass breaks close off both gauge cocks and loosen glass retaining nuts to remove gauge glass Do not use thin glass tubing...

Страница 12: ...Part No 550 141 830 1202...

Отзывы: